|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 5060 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | | Wellbore Permit | | | Permit #: | 19780699 | Expiration Date: | 11/21/1978 | | Proposed Depth/Form: | 5050 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/2/1978 | | Spud Date: | 8/12/1978 | Spud Date Is: | ACTUAL | | Measured TD: | 5060 ft. | Measured PB depth: | 5038 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES - FDC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 425 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5055 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4506 ft. | | N | N | | SHANNON | 4920 ft. | | N | N |
Formation SNSD Formation Classification: OW Status: CM - 12/18/1978 Interval Top: 4922 ft. Interval Bottom: 4936 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 11/2/1978 | Choke Size: | | | Formation Name: | SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/2/1978 | | Treatment Summary: | 500 GALS 7.5% MCA, 8,000 GALS 2% KCL, 90,000 GALS SUPER E W/ 180,000# 20-40 SAND & 75,000# 10-20 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4972 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/1978 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0.1 | | BBLS_OIL | 6 | | CALC_BBLS_H2O | 0.1 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 21000 | | CALC_MCF_GAS | 126 | | CASING_PRESS | 60 | | GRAVITY_OIL | 44 | | MCF_GAS | 126 |
| | Perforation Data: | | Interval Top: | 4922 ft. | # Of Holes: | 15 | | Interval Bottom: | 4936 ft. | Hole Size: | 0.4 in. |
|
Formation SUSX Formation Classification: OW Status: CM - 12/18/1978 Interval Top: 4506 ft. Interval Bottom: 4527 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 12/18/1978 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/2/1978 | | Treatment Summary: | 500 GALS 7.5% MCA, 8,000 GALS 2% KCL, 90,000 GALS SUPER E W/ 175,000# 20-40 SAND, 75,000# 10-20 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5006 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/16/1978 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0.1 | | BBLS_OIL | 17 | | CALC_BBLS_H2O | 0.1 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 2941 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 60 | | GRAVITY_OIL | 42 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 4506 ft. | # Of Holes: | 17 | | Interval Bottom: | 4527 ft. | Hole Size: | 0.4 in. |
|
Formation SX-SN Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 4506 ft. Interval Bottom: 4936 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 11/2/1978 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SX-SN. |
| | Perforation Data: | | Interval Top: | 4506 ft. | # Of Holes: | 32 | | Interval Bottom: | 4936 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 3 |
| Total Gas Produced (MCF) | 1642 |
| GOR | 547333 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.780 |
| Average MCFE per Day | 4.510 |
| Federal Financial Assurance | i | |
|
|