|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2021 Measured TD: 4977 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2021 | | Wellbore Permit | | | Permit #: | 19780453 | Expiration Date: | 9/19/1978 | | Proposed Depth/Form: | 5100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: 0 , Unit Acreage: 40, Drill Unit: SESW |
| | |
| Wellbore Completed | | Completion Date: | 8/22/1978 | | Spud Date: | 6/9/1978 | Spud Date Is: | ACTUAL | | Measured TD: | 4977 ft. | Measured PB depth: | 4934 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 291 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4977 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 360 ft. | | N | N | | SUSSEX | 4277 ft. | | N | N | | SHANNON | 4828 ft. | | N | N |
Formation SX-SN Formation Classification: GW Status: SI - 4/1/2021 Interval Top: 4382 ft. Interval Bottom: 4852 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 8/8/1978 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/22/1978 | | Treatment Summary: | SUSSEX PERF'D 4382'-4420'. SHANNON PERF'D 4828'-4852'. EMULSIFRAC: 12,000 GALS PAD; 36,000 GALS 72,000# 20-40; 60,000 GALS 120,000# 10-20; 9,000 GALS; 35,000# 10-20 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4869 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/8/1978 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 116 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 116 | | CALC_GOR | 2327 | | CALC_MCF_GAS | 270 | | GRAVITY_OIL | 44.4 | | MCF_GAS | 270 |
| | Perforation Data: | | Interval Top: | 4382 ft. | # Of Holes: | | | Interval Bottom: | 4852 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 03/31/2021 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|