|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2023 Measured TD: 5216 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2023 | | Wellbore Permit | | | Permit #: | 19780438 | Expiration Date: | 9/16/1978 | | Proposed Depth/Form: | 5200 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 40, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/25/1986 | | Spud Date: | 5/17/1978 | Spud Date Is: | ACTUAL | | Measured TD: | 5216 ft. | Measured PB depth: | 5161 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 675 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5210 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4526 ft. | | N | N | | SHANNON | 5094 ft. | | N | N |
Formation SNSD Formation Classification: GW Status: CM - 11/25/1986 Interval Top: 5096 ft. Interval Bottom: 5108 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 6/22/1978 | Choke Size: | 0.768 in. | | Formation Name: | SHANNON | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/25/1986 | | Treatment Summary: | K-1 FRAC: 58,000 GALS EMULSION; 36,000# 20/40 MESH; 78,000# 10/20 MESH |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/22/1978 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 39 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 39 | | CALC_MCF_GAS | 56 | | GRAVITY_OIL | 42.6 | | MCF_GAS | 56 |
| | Perforation Data: | | Interval Top: | 5096 ft. | # Of Holes: | 24 | | Interval Bottom: | 5108 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: CM - 11/25/1986 Interval Top: 4680 ft. Interval Bottom: 4719 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 11/25/1986 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/25/1986 | | Treatment Summary: | 440,500# 16/30 SN, 7,500# 16/30 CRC SN, 962 BLO, 508 BLW, 73 BLW FLUSH |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SUSX. |
| | Perforation Data: | | Interval Top: | 4680 ft. | # Of Holes: | 156 | | Interval Bottom: | 4719 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: GW Status: PR - 8/1/2023 Interval Top: 4680 ft. Interval Bottom: 5108 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 11/25/1986 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/25/1986 | | Treatment Summary: | SEE INDIVIDUAL SNSD AND SUSX COMPLETIONS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5127 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/11/1987 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 9167 | | CALC_MCF_GAS | 110 | | GRAVITY_OIL | 41.5 | | MCF_GAS | 110 |
| | Perforation Data: | | Interval Top: | 4680 ft. | # Of Holes: | 180 | | Interval Bottom: | 5108 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 651 |
| Total Gas Produced (MCF) | 276 |
| GOR | 423 |
| GOR Determination | BOE |
| Average BOE per Day | 1.913 |
| Average MCFE per Day | 11.075 |
| Federal Financial Assurance | i | |
|
|