Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-09409
Well Classification: GW Status: PA - 6/3/2019
Well Name/No:POWERS #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/3/2019
FacilityID:241620LocationID:318567
County:WELD #123Location:NWSW 24 2N65W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Planned Location:1650FSL  990 FWLLat/Long: 40.121162 / -104.618174Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.121162 / -104.618174Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/13/2012
End Date: 4/13/2012
Reported: 6/14/2012
Days to report: 62
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/3/2019             Measured TD: 7763 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/3/2019
Wellbore PermitDRIFTED
Permit #: Expiration Date:3/5/2014
Proposed Depth/Form:7750 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 217 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 217 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7750 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 6580 ft., Bottom: 7750 ft.

Wellbore Completed
Completion Date:3/1/1978
Spud Date:2/21/1978Spud Date Is:ACTUAL
Measured TD:7763 ft.Measured PB depth:7703 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:IES & FDC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 217 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 217 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7750 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6600 ft., Bottom: 7750 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1020 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 1115 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 1020 ft., Bottom: 1115 ft., Sacks: 370, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE660 ft.
SUSSEX4470 ft.
NIOBRARA6860 ft.
J SAND7610 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/3/2019                  Interval Top: 7618 ft.    Interval Bottom: 7650 ft.

 Completed Information for Formation J SAND
1st Production Date:6/20/1978Choke Size:0.531 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:6/20/1978
Treatment Summary:SEE SCANNED DOCUMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/1978Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
CALC_GOR 300000
CASING_PRESS 140
GRAVITY_OIL 51
MCF_GAS 600
Perforation Data:
Interval Top:7618 ft.# Of Holes:15
Interval Bottom:7650 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/1/2012                  Interval Top: 7162 ft.    Interval Bottom: 7179 ft.

 Completed Information for Formation CODELL
1st Production Date:4/16/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/13/2012
Treatment Summary:Codell perfs 7162-7179’, 2 spf, 34 holes Frac w/2577 bbl frac fluid and 253,040 # sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7162 ft.# Of Holes:34
Interval Bottom:7179 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/1/2012                  Interval Top: 6926 ft.    Interval Bottom: 7650 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7608 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/10/2012Test Method:Flow
Hours Tested:18Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 13
BTU_GAS 1260
CALC_BBLS_H2O 3
CALC_BBLS_OIL 17
CALC_GOR 4235
CALC_MCF_GAS 72
CASING_PRESS 611
GRAVITY_OIL 53
MCF_GAS 54
TUBING_PRESS 130
Perforation Data:
Interval Top:6926 ft.# Of Holes:141
Interval Bottom:7650 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/3/2019                  Interval Top: 6926 ft.    Interval Bottom: 7179 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/2012Test Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 16
BTU_GAS 1260
CALC_BBLS_H2O 7
CALC_BBLS_OIL 16
CALC_GOR 7188
CALC_MCF_GAS 115
GRAVITY_OIL 53
MCF_GAS 115
TUBING_PRESS 115
Perforation Data:
Interval Top:6926 ft.# Of Holes:126
Interval Bottom:7179 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/1/2012                  Interval Top: 6926 ft.    Interval Bottom: 6949 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/16/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/13/2012
Treatment Summary:Niobrara Perfs 6926-6949’, 4 spf, 92 holes Frac w/3241 bbls frac fluid and 251,320 # sand
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6926 ft.# Of Holes:92
Interval Bottom:6949 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/03/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No