|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/3/2019 Measured TD: 7763 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/3/2019 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 3/5/2014 | Proposed Depth/Form: | 7750 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 217 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 175, Top: 0 ft., Bottom: 217 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7750 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 6580 ft., Bottom: 7750 ft. |
| | |
Wellbore Completed | Completion Date: | 3/1/1978 | Spud Date: | 2/21/1978 | Spud Date Is: | ACTUAL | Measured TD: | 7763 ft. | Measured PB depth: | 7703 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL | Log Types: | IES & FDC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 217 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 0 ft., Bottom: 217 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7750 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6600 ft., Bottom: 7750 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1020 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 0 ft., Bottom: 1115 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 1020 ft., Bottom: 1115 ft., Sacks: 370, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 660 ft. | | | | SUSSEX | 4470 ft. | | | | NIOBRARA | 6860 ft. | | | | J SAND | 7610 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/3/2019 Interval Top: 7618 ft. Interval Bottom: 7650 ft. Completed Information for Formation J SAND | 1st Production Date: | 6/20/1978 | Choke Size: | 0.531 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/20/1978 | Treatment Summary: | SEE SCANNED DOCUMENTS |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/20/1978 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | CALC_GOR | 300000 | CASING_PRESS | 140 | GRAVITY_OIL | 51 | MCF_GAS | 600 |
| Perforation Data: | Interval Top: | 7618 ft. | # Of Holes: | 15 | Interval Bottom: | 7650 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/1/2012 Interval Top: 7162 ft. Interval Bottom: 7179 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/16/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/13/2012 | Treatment Summary: | Codell perfs
7162-7179’, 2 spf, 34 holes
Frac w/2577 bbl frac fluid and 253,040 # sand
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7162 ft. | # Of Holes: | 34 | Interval Bottom: | 7179 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/1/2012 Interval Top: 6926 ft. Interval Bottom: 7650 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7608 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/10/2012 | Test Method: | Flow | Hours Tested: | 18 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 13 | BTU_GAS | 1260 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 17 | CALC_GOR | 4235 | CALC_MCF_GAS | 72 | CASING_PRESS | 611 | GRAVITY_OIL | 53 | MCF_GAS | 54 | TUBING_PRESS | 130 |
| Perforation Data: | Interval Top: | 6926 ft. | # Of Holes: | 141 | Interval Bottom: | 7650 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/3/2019 Interval Top: 6926 ft. Interval Bottom: 7179 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/23/2012 | Test Method: | Flow | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 7 | BBLS_OIL | 16 | BTU_GAS | 1260 | CALC_BBLS_H2O | 7 | CALC_BBLS_OIL | 16 | CALC_GOR | 7188 | CALC_MCF_GAS | 115 | GRAVITY_OIL | 53 | MCF_GAS | 115 | TUBING_PRESS | 115 |
| Perforation Data: | Interval Top: | 6926 ft. | # Of Holes: | 126 | Interval Bottom: | 7179 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 8/1/2012 Interval Top: 6926 ft. Interval Bottom: 6949 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/16/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/13/2012 | Treatment Summary: | Niobrara Perfs
6926-6949’, 4 spf, 92 holes
Frac w/3241 bbls frac fluid and 251,320 # sand |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6926 ft. | # Of Holes: | 92 | Interval Bottom: | 6949 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 06/03/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|