|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2025 Measured TD: 5044 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | 19771150 | Expiration Date: | 3/8/1978 | | Proposed Depth/Form: | 5036 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2SE4 |
| | |
| Wellbore Completed | | Completion Date: | 5/17/1978 | | Spud Date: | 11/20/1977 | Spud Date Is: | ACTUAL | | Measured TD: | 5044 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES, GR-FDC, PDC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5042 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | | 740 ft. | N | N | | SUSSEX | 4540 ft. | | N | N | | SHANNON | 4954 ft. | | N | N |
Formation SNSD Formation Classification: GW Status: CM - 7/10/1979 Interval Top: 4952 ft. Interval Bottom: 4970 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 4/8/1978 | Choke Size: | | | Formation Name: | SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/17/1978 | | Treatment Summary: | 100,000# 20-40 SAND; 82,000# 10-20 SAND; 2,333 BBLS GELLED WATER |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4970 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/17/1978 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 48 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 2813 | | CALC_MCF_GAS | 135 | | CASING_PRESS | 50 | | GRAVITY_OIL | 43 | | MCF_GAS | 135 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 4952 ft. | # Of Holes: | 18 | | Interval Bottom: | 4970 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: CM - 7/10/1979 Interval Top: 4545 ft. Interval Bottom: 4562 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 5/31/1979 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/17/1978 | | Treatment Summary: | 55,000 GALS GELLED WATER; 80,000# 20-40 SAND; 100,000# 10-20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/3/1979 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 3462 | | CALC_MCF_GAS | 45 | | CASING_PRESS | 60 | | GRAVITY_OIL | 47 | | MCF_GAS | 45 | | TUBING_PRESS | 60 |
| | Perforation Data: | | Interval Top: | 4545 ft. | # Of Holes: | 18 | | Interval Bottom: | 4562 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: GW Status: PR - 10/1/2025 Interval Top: 4545 ft. Interval Bottom: 4970 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 7/10/1979 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SX-SN. |
| | Perforation Data: | | Interval Top: | 4545 ft. | # Of Holes: | 36 | | Interval Bottom: | 4970 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 09/2024 - 08/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|