|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/24/2016 Measured TD: 7099 ft. Vertical TD: 7099 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/24/2016 | Wellbore Permit | | Permit #: | 20063167 | Expiration Date: | 7/19/2007 | Proposed Depth/Form: | 7099 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: 40, Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 475 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 0 ft., Bottom: 475 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7098 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 175, Top: , Bottom: 7098 ft. |
| | |
Wellbore Completed | Completion Date: | 9/10/1977 | Spud Date: | 7/7/1977 | Spud Date Is: | ACTUAL | Measured TD: | 7099 ft. | Measured PB depth: | 7057 ft. | True Vertical TD: | 7099 ft. | True Vertical PB depth: | | Log Types: | IES; FDC-GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 475 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: , Bottom: 475 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7098 ft., Weight: 10.5 & 11, Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 6430 ft., Bottom: 7098 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6179 ft. | | N | N | TIMPAS | 6479 ft. | | N | N | CARLILE | 6510 ft. | | N | N | D SAND | 6900 ft. | | N | N | J SAND | 6964 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/24/2016 Interval Top: 6966 ft. Interval Bottom: 6969 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/19/1977 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/10/1977 | Treatment Summary: | 52,000 GAL VERSA GEL FLUID, 45,000# 40/60 MESH, 15,000# 20/40 MESH SAND |
| Tubing Size: | 2 in. | Tubing Setting Depth: | 6922 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/12/1977 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | CALC_GOR | 87500 | CASING_PRESS | 750 | GRAVITY_OIL | 58 | MCF_GAS | 175 | TUBING_PRESS | 30 |
| Perforation Data: | Interval Top: | 6966 ft. | # Of Holes: | 12 | Interval Bottom: | 6969 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/24/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|