|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2024 Measured TD: 5050 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2024 | Wellbore Permit | | Permit #: | 19770578 | Expiration Date: | 10/16/1977 | Proposed Depth/Form: | 5000 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2SE4 |
| | |
Wellbore Completed | Completion Date: | 5/20/1981 | Spud Date: | 8/10/1977 | Spud Date Is: | ACTUAL | Measured TD: | 5050 ft. | Measured PB depth: | 5050 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | IES, FDC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 594 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: , Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5040 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4442 ft. | | N | N | SHANNON | 4900 ft. | | N | N |
Formation SNSD Formation Classification: OW Status: CM - 5/20/1981 Interval Top: 4902 ft. Interval Bottom: 4924 ft. Completed Information for Formation SHANNON | 1st Production Date: | 5/20/1981 | Choke Size: | | Formation Name: | SHANNON | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/20/1981 | Treatment Summary: | 1,479 BO; 919 BW; 296,000# SAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4885 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/9/1977 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 69 | CALC_BBLS_OIL | 69 | CALC_GOR | 4898 | CALC_MCF_GAS | 338 | CASING_PRESS | 400 | MCF_GAS | 338 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 4902 ft. | # Of Holes: | 23 | Interval Bottom: | 4924 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: OW Status: PR - 6/1/2024 Interval Top: 4506 ft. Interval Bottom: 4902 ft. Completed Information for Formation SUSSEX-SHANNON | 1st Production Date: | 5/20/1981 | Choke Size: | 2.000 in. | Formation Name: | SUSSEX-SHANNON | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/20/1981 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 16 | CALC_BBLS_H2O | 5 | CALC_BBLS_OIL | 16 | CALC_GOR | 41812 | CALC_MCF_GAS | 669 | CASING_PRESS | 120 | GRAVITY_OIL | 44.8 | MCF_GAS | 669 | TUBING_PRESS | 120 |
| Perforation Data: | Interval Top: | 4506 ft. | # Of Holes: | 83 | Interval Bottom: | 4902 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: OW Status: CM - 8/8/2008 Interval Top: 4444 ft. Interval Bottom: 4506 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 11/9/1977 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/20/1981 | Treatment Summary: | 834 BW, 296,000# SAND; 1,594 BO |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SUSX. |
| Perforation Data: | Interval Top: | 4444 ft. | # Of Holes: | 60 | Interval Bottom: | 4506 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 7 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 0.019 |
Average MCFE per Day | 0.113 |
Federal Financial Assurance | i | |
|
|