|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2023 Measured TD: 5061 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2023 | Wellbore Permit | | Permit #: | 19770364 | Expiration Date: | 8/22/1977 | Proposed Depth/Form: | 5075 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 80, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 9/19/1977 | Spud Date: | 5/2/1977 | Spud Date Is: | ACTUAL | Measured TD: | 5061 ft. | Measured PB depth: | 5030 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | IES & FDC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 440 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 440 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5060 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 3041 ft., Bottom: 5060 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 160 ft. | | N | N | SUSSEX | 4484 ft. | | N | N | SHANNON | 4907 ft. | | N | N |
Formation SNSD Formation Classification: Status: CM - 12/1/2018 Interval Top: 4912 ft. Interval Bottom: 4926 ft. Completed Information for Formation SHANNON | 1st Production Date: | 7/20/1977 | Choke Size: | | Formation Name: | SHANNON | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SNSD. |
| Perforation Data: | Interval Top: | 4912 ft. | # Of Holes: | 30 | Interval Bottom: | 4926 ft. | Hole Size: | 0.4 in. |
|
Formation SUSX Formation Classification: GW Status: CM - 7/20/1977 Interval Top: 4484 ft. Interval Bottom: 4496 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 7/20/1977 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SUSX. |
| Perforation Data: | Interval Top: | 4484 ft. | # Of Holes: | 26 | Interval Bottom: | 4496 ft. | Hole Size: | 0.4 in. |
|
Formation SX-SN Formation Classification: GW Status: PR - 6/1/2023 Interval Top: 4484 ft. Interval Bottom: 4926 ft. Completed Information for Formation SUSSEX-SHANNON | 1st Production Date: | 7/20/1977 | Choke Size: | | Formation Name: | SUSSEX-SHANNON | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/19/1977 | Treatment Summary: | 4484'-4496' (SUSX): 94,500 GALS SUPER E W/ 180,000# 20-40 SAND & 75,000# 10-20 SAND; 4912'-4926' (SNSD): 95,000 GALS SUPER E EMULSION CARRYING 180,000# 20-40 SAND & 75,000# 10-20 SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4977 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/19/1977 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0.1 | BBLS_OIL | 72 | CALC_BBLS_H2O | 0.1 | CALC_BBLS_OIL | 72 | CALC_GOR | 3083 | CALC_MCF_GAS | 222 | CASING_PRESS | 30 | GRAVITY_OIL | 48.8 | MCF_GAS | 222 |
| Perforation Data: | Interval Top: | 4484 ft. | # Of Holes: | 56 | Interval Bottom: | 4926 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 01/30/2025 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 798 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.374 |
Average MCFE per Day | 2.165 |
Federal Financial Assurance | i | |
|
|