|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2025 Measured TD: 4956 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 19761328 | Expiration Date: | 4/28/1977 | | Proposed Depth/Form: | 4950 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/17/1977 | | Spud Date: | 1/1/1977 | Spud Date Is: | ACTUAL | | Measured TD: | 4956 ft. | Measured PB depth: | 4912 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES & FDC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 412 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4948 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4375 ft. | | N | N | | SHANNON | 4805 ft. | | N | N |
Formation SNSD Formation Classification: GW Status: CM - 3/12/1977 Interval Top: 4810 ft. Interval Bottom: 4829 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 2/17/1977 | Choke Size: | | | Formation Name: | SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/17/1977 | | Treatment Summary: | 90,000 GALS GELLED WATER, 30,000# 100 MESH, 110,000# 20-40, 50,000# 10-20 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4850 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/2/1977 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0.1 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 0.1 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 55200 | | CALC_MCF_GAS | 552 | | CASING_PRESS | 500 | | MCF_GAS | 552 |
| | Perforation Data: | | Interval Top: | 4810 ft. | # Of Holes: | 20 | | Interval Bottom: | 4829 ft. | Hole Size: | 0.4 in. |
|
Formation SUSX Formation Classification: GW Status: CM - 3/12/1977 Interval Top: 4375 ft. Interval Bottom: 4394 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 3/12/1977 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/17/1977 | | Treatment Summary: | 118,000 GALS GELLED WATER, 30,000# 100 MESH, 110,000# 20-40, 50,000# 10-20 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4317 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/17/1977 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0.1 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 0.1 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3600 | | CALC_MCF_GAS | 108 | | CASING_PRESS | 665 | | GRAVITY_OIL | 44 | | MCF_GAS | 108 |
| | Perforation Data: | | Interval Top: | 4375 ft. | # Of Holes: | 20 | | Interval Bottom: | 4394 ft. | Hole Size: | 0.4 in. |
|
Formation SX-SN Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 4375 ft. Interval Bottom: 4829 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 3/12/1977 | Choke Size: | | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SX-SN. |
| | Perforation Data: | | Interval Top: | 4375 ft. | # Of Holes: | 40 | | Interval Bottom: | 4829 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 242 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.114 |
| Average MCFE per Day | 0.659 |
| Federal Financial Assurance | i | |
|
|