|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/12/2019 Measured TD: 8116 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/12/2019 | | Wellbore Permit | | | Permit #: | 19761163 | Expiration Date: | 3/15/1977 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 3/25/1977 | | Spud Date: | 11/19/1976 | Spud Date Is: | ACTUAL | | Measured TD: | 8116 ft. | Measured PB depth: | 8046 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES & FDC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 458 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 458 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 7070 ft., Bottom: 8109 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 150 ft. | | N | N | | SUSSEX | 4450 ft. | | N | N | | SHANNON | 4857 ft. | | N | N | | NIOBRARA | 7258 ft. | | N | N | | J SAND | 7958 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/12/2019 Interval Top: 7972 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/29/1977 | Choke Size: | 0.250 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/25/1977 | | Treatment Summary: | 190,900 GALS VERSA FRAC, 93,600# 100 MESH, 201,000# 20-40, & 100,000# 10-20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/31/1977 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 91667 | | CALC_MCF_GAS | 1100 | | MCF_GAS | 1100 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 7972 ft. | # Of Holes: | 19 | | Interval Bottom: | 7990 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/12/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|