|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2023 Measured TD: 5160 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2023 | Wellbore Permit | | Permit #: | 19751122 | Expiration Date: | 4/23/1976 | Proposed Depth/Form: | 5150 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: S2SE4 |
| | |
Wellbore Completed | Completion Date: | 4/14/1976 | Spud Date: | 12/31/1975 | Spud Date Is: | ACTUAL | Measured TD: | 5160 ft. | Measured PB depth: | 5126 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SP-IES & FDC-GR CALIPER LOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 554 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: , Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 5160 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 475 ft. | | N | N | SUSSEX | 4564 ft. | | N | N | SHANNON | 5019 ft. | | N | N |
Formation SNSD Formation Classification: GW Status: CM - 3/13/1976 Interval Top: 5019 ft. Interval Bottom: 5042 ft. Completed Information for Formation SHANNON | 1st Production Date: | 3/13/1976 | Choke Size: | | Formation Name: | SHANNON | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/14/1976 | Treatment Summary: | 117,180 GALS; 72,000# 20-40 SAND; 156,000# 10-20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/13/1976 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 153 | CALC_BBLS_H2O | 20 | CALC_BBLS_OIL | 153 | CALC_MCF_GAS | 204 | GRAVITY_OIL | 47.9 | MCF_GAS | 204 |
| Perforation Data: | Interval Top: | 5019 ft. | # Of Holes: | 46 | Interval Bottom: | 5042 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: CM - 3/13/1976 Interval Top: 4586 ft. Interval Bottom: 4627 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 3/13/1976 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/14/1976 | Treatment Summary: | 121,380 GALS; 72,000# 20-40 SAND; 156,000# 10-20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/13/1976 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 197 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 197 | CALC_MCF_GAS | 180 | MCF_GAS | 180 |
| Perforation Data: | Interval Top: | 4586 ft. | # Of Holes: | 82 | Interval Bottom: | 4627 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: GW Status: SI - 5/1/2023 Interval Top: 4586 ft. Interval Bottom: 5042 ft. Completed Information for Formation SUSSEX-SHANNON | 1st Production Date: | 3/13/1976 | Choke Size: | | Formation Name: | SUSSEX-SHANNON | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SX-SN. |
| Perforation Data: | Interval Top: | 4586 ft. | # Of Holes: | 128 | Interval Bottom: | 5042 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 04/30/2023 |
Low Producing | Y | Production Period 06/2024 - 05/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|