|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2025 Measured TD: 5096 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 19750596 | Expiration Date: | 11/10/1975 | | Proposed Depth/Form: | 5100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 0 , Unit Acreage: 80, Drill Unit: N2NE |
| | |
| Wellbore Completed | | Completion Date: | 9/4/1975 | | Spud Date: | 7/18/1975 | Spud Date Is: | ACTUAL | | Measured TD: | 5096 ft. | Measured PB depth: | 5030 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES -FDC/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 135 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 0 ft., Bottom: 135 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5095 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 4170 ft., Bottom: 5095 ft., Determination Method: | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 953 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 413 ft., Bottom: 965 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4687 ft. | | | |
Formation SUSX Formation Classification: OW Status: PR - 4/1/2025 Interval Top: 4904 ft. Interval Bottom: 4928 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 9/4/1975 | Choke Size: | 0.000 in. | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/4/1975 | | Treatment Summary: | SUPER EMULSION FRAC 84,000 GAL W/40,000# 20/40 SD, 200,000# 10/20 SD, 5000# UCAR PAC AT 26 BPM AT 2400 PSI ISIP 1050 PSI |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4926 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/4/1975 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 32 | | CALC_GOR | 3750 | | CASING_PRESS | 20 | | GRAVITY_OIL | 41 | | MCF_GAS | 120 | | TUBING_PRESS | 15 |
| | Perforation Data: | | Interval Top: | 4904 ft. | # Of Holes: | | | Interval Bottom: | 4928 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 326 |
| Total Gas Produced (MCF) | 20 |
| GOR | 61 |
| GOR Determination | BOE |
| Average BOE per Day | 0.895 |
| Average MCFE per Day | 5.214 |
| Federal Financial Assurance | i | |
|
|