|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/27/2016 Measured TD: 7920 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/27/2016 | Wellbore Permit | | Permit #: | | Expiration Date: | 8/30/2012 | Proposed Depth/Form: | 7920 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 207 ft., Weight: 28 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 207 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7920 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 7755 ft., Bottom: 7920 ft. |
| | |
Wellbore Completed | Completion Date: | 9/5/1975 | Spud Date: | 7/1/1975 | Spud Date Is: | ACTUAL | Measured TD: | 7920 ft. | Measured PB depth: | 7857 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SP-IES & FDC-GR CALIPER LOGS | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 207 ft., Weight: 28 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 207 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7920 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7300 ft., Bottom: 7920 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | MUDDY J | 7755 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/27/2016 Interval Top: 7757 ft. Interval Bottom: 7806 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/21/1975 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/5/1975 | Treatment Summary: | 262,500 GALS; 403,200# 20/40 SAND; 76,600# 10/20 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/5/1975 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 13 | BBLS_OIL | 27 | CALC_GOR | 32555 | CALC_MCF_GAS | 879 | GRAVITY_OIL | 60 | MCF_GAS | 879 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7757 ft. | # Of Holes: | 64 | Interval Bottom: | 7806 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 01/27/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|