Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-08201
Well Classification: GW Status: PA - 5/8/2014
Well Name/No:HERMAN WAGNER GAS UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/8/2014
FacilityID:240413LocationID:336185
Municipality/County:FIRESTONE / WELD #123Location:SWNE 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1650FNL  1580 FELLat/Long: 40.199926 / -104.947565Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.200040 / -104.947430Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/8/2014             Measured TD: 7800 ft.    Vertical TD: 7800 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/8/2014
Wellbore Permit
Permit #:19740938 Expiration Date:4/8/1996
Proposed Depth/Form:7825 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 407-66 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:1/28/1975
Spud Date:11/8/1974Spud Date Is:ACTUAL
Measured TD:7800 ft.Measured PB depth:7749 ft.
True Vertical TD:7800 ft.True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 201 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 201 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7800 ft., Weight: 10.5/11.6, Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6928 ft., Bottom: 7800 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6890 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 6384 ft., Bottom: 6890 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4000 ft.4280 ft.NN
SHANNON4598 ft.5365 ft.NN
NIOBRARA6920 ft.7194 ft.NN
CODELL7216 ft.7228 ft.NN
J SAND7645 ft.7680 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/8/2014                  Interval Top: 7664 ft.    Interval Bottom: 7680 ft.

 Completed Information for Formation J SAND
1st Production Date:2/20/1974Choke Size:0.271 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:1/28/1975
Treatment Summary:167244 GAL; 50,400# 100 MESH SAND; 201,600# 20/40 SAND; 25,000# 10/20 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7204 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/28/1975Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 80
CALC_BBLS_H2O 0
CALC_BBLS_OIL 80
CALC_GOR 14375
CALC_MCF_GAS 1150
CASING_PRESS 1700
GRAVITY_OIL 60
MCF_GAS 1150
TUBING_PRESS 1650
Perforation Data:
Interval Top:7664 ft.# Of Holes:
Interval Bottom:7680 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 5/8/2014                  Interval Top: 7228 ft.    Interval Bottom: 7664 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:1/28/1975
Treatment Summary:COMMINGLED J-CODL
Tubing Size:2.375 in.Tubing Setting Depth:7639 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/10/2002Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 6
CALC_BBLS_H2O 0
CALC_BBLS_OIL 6
CALC_GOR 27500
CALC_MCF_GAS 165
CASING_PRESS 450
GRAVITY_OIL 60
MCF_GAS 165
TUBING_PRESS 350
Perforation Data:
Interval Top:7228 ft.# Of Holes:
Interval Bottom:7664 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 5/8/2014                  Interval Top: 7216 ft.    Interval Bottom: 7228 ft.

 Completed Information for Formation CODELL
1st Production Date:4/16/1996Choke Size:0.438 in.
Formation Name:CODELLCommingled:
Production Method:PLUNGER
Open Hole Completion:
Formation Treatment
Treatment Date:1/28/1975
Treatment Summary:PUMPED 387 BBLS OF X LINK AND 1019 BBLS OF X LINK W 200,000# OF 20/40 SAND, FLUSHED WITH 30 BBLS OF 2% KCL. MAX PSI: 6850, MAX RATE 17.2 BPM // REFRAC CODL #100 MESH 261500 #20/40 MESH 91056 GAL. GELLED FLUID REPERFORATED CODELL FROM 7218'-7228' TEST PRODUCTION REPRESENTS CODL FORMATIONS
Tubing Size:2.375 in.Tubing Setting Depth:7201 ft.
Tubing Packer Depth:7350 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2002Test Method:PLUNGER
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 5
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 19000
CALC_MCF_GAS 95
CASING_PRESS 400
GRAVITY_OIL 60
MCF_GAS 95
TUBING_PRESS 200
Perforation Data:
Interval Top:7216 ft.# Of Holes:
Interval Bottom:7228 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/08/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No