|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2025 Measured TD: 5155 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2025 | | Wellbore Permit | | | Permit #: | 19740700 | Expiration Date: | 12/29/1974 | | Proposed Depth/Form: | 5135 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 80, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/10/1976 | | Spud Date: | 10/4/1974 | Spud Date Is: | ACTUAL | | Measured TD: | 5155 ft. | Measured PB depth: | 5108 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES & FDC-GR CALIPER LOGS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 565 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5134 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 605 ft. | | N | N | | SUSSEX | 4592 ft. | | N | N | | SHANNON | 5032 ft. | | N | N |
Formation SNSD Formation Classification: GW Status: CM - 11/27/1975 Interval Top: 5032 ft. Interval Bottom: 5052 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 10/29/1975 | Choke Size: | | | Formation Name: | SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/10/1976 | | Treatment Summary: | 121,500 GALS; 72,000# 20-40 SAND; 156,000# 10-20 SAND; 3,500# 8112 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SNSD. |
| | Perforation Data: | | Interval Top: | 5032 ft. | # Of Holes: | 40 | | Interval Bottom: | 5052 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: CM - 11/27/1975 Interval Top: 4592 ft. Interval Bottom: 4616 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 10/29/1975 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/10/1976 | | Treatment Summary: | 122,000 GALS; 72,000# 20-40 SAND; 156,000# 10-20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/25/1975 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 50 | | GRAVITY_OIL | 43.8 | | MCF_GAS | 123 |
| | Perforation Data: | | Interval Top: | 4592 ft. | # Of Holes: | 48 | | Interval Bottom: | 4616 ft. | Hole Size: | |
|
Formation SX-SN Formation Classification: GW Status: PR - 8/1/2025 Interval Top: 4592 ft. Interval Bottom: 5052 ft.| Completed Information for Formation SUSSEX-SHANNON | | 1st Production Date: | 10/29/1975 | Choke Size: | 0.343 in. | | Formation Name: | SUSSEX-SHANNON | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/16/1975 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 192 | | GRAVITY_OIL | 45.3 | | MCF_GAS | 318 |
| | Perforation Data: | | Interval Top: | 4592 ft. | # Of Holes: | 88 | | Interval Bottom: | 5052 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 33 |
| Total Gas Produced (MCF) | 597 |
| GOR | 18090 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.371 |
| Average MCFE per Day | 2.151 |
| Federal Financial Assurance | i | |
|
|