|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/25/2018 Measured TD: 8155 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/25/2018 | | Wellbore Permit | | | Permit #: | 20085401 | Expiration Date: | 8/27/2009 | | Proposed Depth/Form: | 8155 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: J-CDL , Formation: J-CODELL , Order: , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 220 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 220 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8155 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 7206 ft., Bottom: 8155 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 2/10/1974 | Spud Date Is: | ACTUAL | | Measured TD: | 8155 ft. | Measured PB depth: | 8103 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | SP-IES,FDC-GR CALIPER, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 220 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 220 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8155 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7206 ft., Bottom: 8155 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7191 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 6953 ft., Bottom: 7191 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 6953 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 6690 ft., Bottom: 6953 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1096 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 760 ft., Bottom: 1096 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 5180 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 4584 ft., Bottom: 5180 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6690 ft., Depth: 6982 ft., Bottom: 7191 ft., Sacks: 125, Method: PERF & PUMP | | Additional Cement: | String Type: 1ST , Top: 6690 ft., Depth: 6982 ft., Bottom: 6953 ft., Sacks: 125, Method: PERF & PUMP | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | | | N | N | | SUSSEX | 4630 ft. | | N | N | | NIOBRARA | 7211 ft. | | N | N | | CODELL | 7539 ft. | | N | N | | J SAND | 7990 ft. | | N | N | | MUDDY J | 8000 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 6/27/2016 Interval Top: 8000 ft. Interval Bottom: 8024 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/18/1974 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/8/2012 | | Treatment Summary: | PERF J SAND 8000-8024 HOLES 28 SIZE .344
MILLED OUT CIBP ON 3/8/2012 TO COMINGLE WITH SUSSEX AND CODELL | | Formation Treatment | | Treatment Date: | 3/27/1974 | | Treatment Summary: | CIBP @ 4950. 2 SACKS OF CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE THE J SAND WITH THE SUSSEX WITHIN THE NEXT SIX MONTHS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 14 | | CALC_GOR | 38571 | | MCF_GAS | 540 |
| | Perforation Data: | | Interval Top: | 8000 ft. | # Of Holes: | 28 | | Interval Bottom: | 8024 ft. | Hole Size: | 0.35 in. |
|
Formation CODL Formation Classification: OW Status: AB - 6/27/2016 Interval Top: 7539 ft. Interval Bottom: 7555 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/29/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/8/2012 | | Treatment Summary: | PERF CODELL 7539-7555 HOLES 64 SIZE .375
MILLED OUT CIBP ON 3/8/2012 TO COMINGLE WITH SUSSEX AND J SAND
| | Formation Treatment | | Treatment Date: | 3/19/2008 | | Treatment Summary: | CIBP@ 4950. 2 SACKS OF CEMENT ON TOP OF CIBP FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND COMMINGLE THE CODELL WITH THE SUSSEX WITHIN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 78 | | BBLS_OIL | 34 | | BTU_GAS | 1218 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 16000 | | CALC_MCF_GAS | 8 | | CASING_PRESS | 210 | | GRAVITY_OIL | 44 | | MCF_GAS | 41 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 7539 ft. | # Of Holes: | 64 | | Interval Bottom: | 7555 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 1/5/1996 Interval Top: 7539 ft. Interval Bottom: 8024 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 1/11/1996 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/5/1996 | Test Method: | FLOWING | | Hours Tested: | 48 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 7250 | | CALC_MCF_GAS | 29 | | MCF_GAS | 58 |
| | Perforation Data: | | Interval Top: | 7539 ft. | # Of Holes: | | | Interval Bottom: | 8024 ft. | Hole Size: | |
|
Formation JCDSX Formation Classification: OW Status: CM - 3/22/2012 Interval Top: 4852 ft. Interval Bottom: 8024 ft.| Completed Information for Formation J-CODELL-SUSSEX | | 1st Production Date: | 3/21/2012 | Choke Size: | 24.000 in. | | Formation Name: | J-CODELL-SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/8/2012 | | Treatment Summary: | PERF SUSSEX 4852-4876 HOLES 72 SIZE .375
PERF CODELL 7539-7555 HOLES 64 SIZE .375
PERF J SAND 8000-8024 HOLES 28 SIZE .344 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7977 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/22/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1301 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 22000 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 968 | | GRAVITY_OIL | 46 | | MCF_GAS | 22 | | TUBING_PRESS | 1007 |
| | Perforation Data: | | Interval Top: | 4852 ft. | # Of Holes: | 164 | | Interval Bottom: | 8024 ft. | Hole Size: | 0.375 in. |
|
Formation SUSX Formation Classification: OW Status: AB - 5/25/2018 Interval Top: 4852 ft. Interval Bottom: 4876 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 11/6/2008 | Choke Size: | 0.156 in. | | Formation Name: | SUSSEX | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/8/2008 | | Treatment Summary: | LIGHTNING 20# 60/50Q NITROGEN FOAM, 108,100# 16/30, 20/000# 12/20 SB EXCEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4834 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/14/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1198 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 100 | | CALC_MCF_GAS | 3 | | CASING_PRESS | 210 | | GRAVITY_OIL | 44 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 4852 ft. | # Of Holes: | 72 | | Interval Bottom: | 4876 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/25/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|