|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/26/2017 Measured TD: 7790 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/26/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 19731033 | Expiration Date: | 12/14/1974 | | Proposed Depth/Form: | 7790 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: SW/4 |
| | |
| Wellbore Completed | | Completion Date: | 4/9/1974 | | Spud Date: | 2/27/1974 | Spud Date Is: | ACTUAL | | Measured TD: | 7790 ft. | Measured PB depth: | 7738 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES,FDC-GR CALIPER,CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 233 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 10 ft., Bottom: 233 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7773 ft., Weight: 10.50 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6685 ft., Bottom: 7773 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 754 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 500 ft., Bottom: 754 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: 754 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 754 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 595 ft. | | | | | SUSSEX | 4370 ft. | | | | | NIOBRARA | 6910 ft. | | | | | CODELL | 7190 ft. | | | | | J SAND | 7639 ft. | | | | | MUDDY J | 7655 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/26/2017 Interval Top: 7653 ft. Interval Bottom: 7684 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/8/1974 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7642 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/8/1974 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 42 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 42 | | CALC_MCF_GAS | 1018 | | MCF_GAS | 1018 |
| | Perforation Data: | | Interval Top: | 7653 ft. | # Of Holes: | | | Interval Bottom: | 7684 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 9/26/2017 Interval Top: 7190 ft. Interval Bottom: 7206 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/13/1995 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7642 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/13/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 47 | | BBLS_OIL | 17 | | CALC_BBLS_H2O | 47 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 1765 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 1754 | | MCF_GAS | 30 | | TUBING_PRESS | 1784 |
| | Perforation Data: | | Interval Top: | 7190 ft. | # Of Holes: | 65 | | Interval Bottom: | 7206 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 12/1/1995| Completed Information for Formation J-CODELL | | 1st Production Date: | 12/1/1995 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7642 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/1/1995 | Test Method: | FLOWING | | Hours Tested: | 72 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 6 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 6 | | MCF_GAS | 18 |
| | No Perforation Data was found for formation J-CDL. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/26/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|