Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07856
Well Classification: OW Status: PA - 9/24/2019
Well Name/No:WANDELL #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/24/2019
FacilityID:240068LocationID:336439
Municipality/County:FIRESTONE / WELD #123Location:NENE 7 2N67W 6
Field:WATTENBERG - #90750Elevation:4890 ft.
Planned Location:990FNL  990 FELLat/Long: 40.157566 / -104.927604Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.157673 / -104.927337Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/24/2019             Measured TD: 7911 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/24/2019
Wellbore PermitDRIFTED
Permit #:19730702 Expiration Date:8/29/1974
Proposed Depth/Form:7911 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:11/8/1973
Spud Date:9/5/1973Spud Date Is:ACTUAL
Measured TD:7911 ft.Measured PB depth:7871 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:IES, FDC-GR & CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 208 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 208 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7907 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6930 ft., Bottom: 7907 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 692 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 320 ft., Bottom: 640 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4210 ft.
SHANNON4776 ft.
NIOBRARA7100 ft.
CARLILE7414 ft.
GREENHORN7464 ft.
BENTONITE7650 ft.
D SAND7768 ft.
J SAND7800 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/24/2019                 Interval Top: 7792 ft.    Interval Bottom: 7852 ft.

 Completed Information for Formation J SAND
1st Production Date:11/11/1973Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/8/1973
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 38
BBLS_OIL 18
CALC_BBLS_H2O 38
CALC_BBLS_OIL 18
CALC_GOR 135000
CALC_MCF_GAS 1250
CASING_PRESS 670
MCF_GAS 1250
TUBING_PRESS 170
Perforation Data:
Interval Top:7792 ft.# Of Holes:7
Interval Bottom:7852 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/6/2003                 Interval Top: 7190 ft.    Interval Bottom: 7852 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/29/1995Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/8/1973
Treatment Summary:DRILL DIBP. RIH W/TBG. TAGGED CIBP TO 7836'. DRILL AND PUSH CIBP TO 7848'. POOH W/TBG LAND TBG @ 7767'. RAN BROACH TO PSN. SWAB. TURN WELL OVER TO PRODUCTION.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 10
CALC_BBLS_H2O 5
CALC_BBLS_OIL 10
CALC_GOR 7800
CALC_MCF_GAS 78
CASING_PRESS 640
MCF_GAS 78
TUBING_PRESS 400
Perforation Data:
Interval Top:7190 ft.# Of Holes:20
Interval Bottom:7852 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/24/2019                 Interval Top: 7132 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/26/2010
Treatment Summary:ADDED PERFS TO CODELL @ 7392-7416', 2 SPF, 48 SHOTS; NIOBRARA - FRAC'D WITH 142,044 GAL FRAC FLUID CONTAINING 250,600 # SAND; CODELL - FRAC'D WITH 115,962 GAL FRAC FLUID CONTAINING 250,100 # SAND.
Formation Treatment
Treatment Date:11/8/1973
Treatment Summary:SEE SCAN DOCUMENT
Tubing Size:2.375 in.Tubing Setting Depth:7700 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2010Test Method:FLOWING
Hours Tested:14Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 14
BTU_GAS 1328
CALC_BBLS_H2O 24
CALC_BBLS_OIL 24
CALC_GOR 15000
CALC_MCF_GAS 360
CASING_PRESS 571
GRAVITY_OIL 56
MCF_GAS 210
TUBING_PRESS 180
Perforation Data:
Interval Top:7132 ft.# Of Holes:131
Interval Bottom:7416 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/9/2003                  Interval Top: 7132 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/8/1973
Treatment Summary:SET CIBP @ 7370'. RIH W/PLUG&PKR. SET PLUG&PKR. POOH W/TBG. LD PLUG&PKR. PERF THE NIOBRAR FROM 7280'-7320',7312'-7175' W/SPF. FRAC'D W,/240,396 GAL SLICK WATER CONTAINING 100,400# 20/40 SAND. FLOW BACK FRAC. RIH W/TBG. LAND TBG. SWAB
Tubing Size:2.375 in.Tubing Setting Depth:7181 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/9/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 15
CALC_BBLS_H2O 20
CALC_BBLS_OIL 15
CALC_GOR 44667
CALC_MCF_GAS 670
CASING_PRESS 520
MCF_GAS 670
TUBING_PRESS 300
Perforation Data:
Interval Top:7132 ft.# Of Holes:83
Interval Bottom:7320 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/24/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No