|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/24/2019 Measured TD: 7911 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/24/2019 | Wellbore Permit | DRIFTED | Permit #: | 19730702 | Expiration Date: | 8/29/1974 | Proposed Depth/Form: | 7911 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 |
| | |
Wellbore Completed | Completion Date: | 11/8/1973 | Spud Date: | 9/5/1973 | Spud Date Is: | ACTUAL | Measured TD: | 7911 ft. | Measured PB depth: | 7871 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | IES, FDC-GR & CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 208 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 0 ft., Bottom: 208 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7907 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 6930 ft., Bottom: 7907 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 692 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 320 ft., Bottom: 640 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4210 ft. | | | | SHANNON | 4776 ft. | | | | NIOBRARA | 7100 ft. | | | | CARLILE | 7414 ft. | | | | GREENHORN | 7464 ft. | | | | BENTONITE | 7650 ft. | | | | D SAND | 7768 ft. | | | | J SAND | 7800 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/24/2019 Interval Top: 7792 ft. Interval Bottom: 7852 ft. Completed Information for Formation J SAND | 1st Production Date: | 11/11/1973 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/8/1973 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 38 | BBLS_OIL | 18 | CALC_BBLS_H2O | 38 | CALC_BBLS_OIL | 18 | CALC_GOR | 135000 | CALC_MCF_GAS | 1250 | CASING_PRESS | 670 | MCF_GAS | 1250 | TUBING_PRESS | 170 |
| Perforation Data: | Interval Top: | 7792 ft. | # Of Holes: | 7 | Interval Bottom: | 7852 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/6/2003 Interval Top: 7190 ft. Interval Bottom: 7852 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/29/1995 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/8/1973 | Treatment Summary: | DRILL DIBP. RIH W/TBG. TAGGED CIBP TO 7836'. DRILL AND PUSH CIBP TO 7848'. POOH W/TBG LAND TBG @ 7767'. RAN BROACH TO PSN. SWAB. TURN WELL OVER TO PRODUCTION. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/6/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 10 | CALC_BBLS_H2O | 5 | CALC_BBLS_OIL | 10 | CALC_GOR | 7800 | CALC_MCF_GAS | 78 | CASING_PRESS | 640 | MCF_GAS | 78 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 7190 ft. | # Of Holes: | 20 | Interval Bottom: | 7852 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/24/2019 Interval Top: 7132 ft. Interval Bottom: 7416 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/26/2010 | Treatment Summary: | ADDED PERFS TO CODELL @ 7392-7416', 2 SPF, 48 SHOTS; NIOBRARA - FRAC'D WITH 142,044 GAL FRAC FLUID CONTAINING 250,600 # SAND; CODELL - FRAC'D WITH 115,962 GAL FRAC FLUID CONTAINING 250,100 # SAND. | Formation Treatment | Treatment Date: | 11/8/1973 | Treatment Summary: | SEE SCAN DOCUMENT |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7700 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/27/2010 | Test Method: | FLOWING | Hours Tested: | 14 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 14 | BBLS_OIL | 14 | BTU_GAS | 1328 | CALC_BBLS_H2O | 24 | CALC_BBLS_OIL | 24 | CALC_GOR | 15000 | CALC_MCF_GAS | 360 | CASING_PRESS | 571 | GRAVITY_OIL | 56 | MCF_GAS | 210 | TUBING_PRESS | 180 |
| Perforation Data: | Interval Top: | 7132 ft. | # Of Holes: | 131 | Interval Bottom: | 7416 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/9/2003 Interval Top: 7132 ft. Interval Bottom: 7320 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/8/1973 | Treatment Summary: | SET CIBP @ 7370'. RIH W/PLUG&PKR. SET PLUG&PKR. POOH W/TBG. LD PLUG&PKR. PERF THE NIOBRAR FROM 7280'-7320',7312'-7175' W/SPF. FRAC'D W,/240,396 GAL SLICK WATER CONTAINING 100,400# 20/40 SAND. FLOW BACK FRAC. RIH W/TBG. LAND TBG. SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7181 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/9/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 15 | CALC_BBLS_H2O | 20 | CALC_BBLS_OIL | 15 | CALC_GOR | 44667 | CALC_MCF_GAS | 670 | CASING_PRESS | 520 | MCF_GAS | 670 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 7132 ft. | # Of Holes: | 83 | Interval Bottom: | 7320 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 09/24/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|