Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07850
Well Classification: OW Status: PA - 11/11/2013
Well Name/No:JAMES T CALHOUN UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/11/2013
FacilityID:240062LocationID:317850
County:WELD #123Location:SWSW 31 3N66W 6
Field:WATTENBERG - #90750Elevation:4834 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  1140 FWLLat/Long: 40.176627 / -104.825771Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.176653 / -104.825939Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/11/2013             Measured TD: 7950 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/11/2013
Wellbore Permit
Permit #:19730692 Expiration Date:5/6/1996
Proposed Depth/Form:7920 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: J-CDL , Formation: J-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/25/1974
Spud Date:12/8/1973Spud Date Is:ACTUAL
Measured TD:7950 ft.Measured PB depth:7916 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER-CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 567 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 575 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7950 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7124 ft., Bottom: 7932 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4720 ft., Bottom: 4721 ft., Determination Method:
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4080 ft., Bottom: 4081 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4280 ft.NN
SHANNON4884 ft.NN
NIOBRARA7050 ft.NN
CODELL7330 ft.NN
J SAND7770 ft.NN
MUDDY J7770 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 11/11/2013                Interval Top: 7770 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation J SAND
1st Production Date:3/13/1974Choke Size: 
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/1974
Treatment Summary:188,664 GALS; 67,000# 100 MESH SN; 184,000# 20/40 SN; 25,500# 10/20 SN.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/24/1974Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 6
CALC_BBLS_H2O 2
CALC_BBLS_OIL 6
CALC_MCF_GAS 1016
MCF_GAS 1016
Perforation Data:
Interval Top:7770 ft.# Of Holes:40
Interval Bottom:7820 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  AB - 11/11/2013                Interval Top: 7330 ft.    Interval Bottom: 7350 ft.

 Completed Information for Formation CODELL
1st Production Date:2/1/1996Choke Size: 
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/1974
Treatment Summary:DIVERTAFRAC: PUMPED 72 BBLS POLYMER GEL & 212 BBLS OF GEL W/4,500# 20/40 SAND. FLUSHED W/102 BBLS GEL. CODL FRAC: PUMPED 484 BBLS POLYMER GEL & 907 BBLS GEL W/175,000# 20/40 SAND. FLUSHED W/29 BBLS GEL. MAX PSI: 6,600. MAX RATE:15.7 BPM.
Tubing Size:2.375 in.Tubing Setting Depth:7334 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/1996Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 100
CALC_BBLS_H2O 7
CALC_BBLS_OIL 100
CALC_GOR 1140
CALC_MCF_GAS 114
CASING_PRESS 1980
MCF_GAS 114
TUBING_PRESS 961
Perforation Data:
Interval Top:7330 ft.# Of Holes:80
Interval Bottom:7350 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/11/2013                Interval Top: 7330 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation J-CODELL
1st Production Date:4/23/1997Choke Size: 
Formation Name:J-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/1974
Treatment Summary:COMMINGLE J SAND & CODELL
Tubing Size:2.375 in.Tubing Setting Depth:7759 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/1997Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 9
CALC_BBLS_H2O 6
CALC_BBLS_OIL 9
CALC_GOR 58444
CALC_MCF_GAS 526
MCF_GAS 526
Perforation Data:
Interval Top:7330 ft.# Of Holes:120
Interval Bottom:7820 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/11/2013
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No