Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07850
Well Classification: OW Status: PA - 11/11/2013
Well Name/No:JAMES T CALHOUN UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/11/2013
FacilityID:240062LocationID:317850
County:WELD #123Location:SWSW 31 3N66W 6
Field:WATTENBERG - #90750Elevation:4834 ft.
Planned Location:990FSL  1140 FWLLat/Long: 40.176627 / -104.825771Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.176653 / -104.825939Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/11/2013             Measured TD: 7950 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/11/2013
Wellbore Permit
Permit #:19730692 Expiration Date:5/6/1996
Proposed Depth/Form:7920 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: J-CDL , Formation: J-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:3/25/1974
Spud Date:12/8/1973Spud Date Is:ACTUAL
Measured TD:7950 ft.Measured PB depth:7916 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER-CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 567 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 575 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7950 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7124 ft., Bottom: 7932 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4720 ft., Bottom: 4721 ft., Determination Method:
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4080 ft., Bottom: 4081 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4280 ft.NN
SHANNON4884 ft.NN
NIOBRARA7050 ft.NN
CODELL7330 ft.NN
J SAND7770 ft.NN
MUDDY J7770 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 11/11/2013                Interval Top: 7770 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation J SAND
1st Production Date:3/13/1974Choke Size: 
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/1974
Treatment Summary:188,664 GALS; 67,000# 100 MESH SN; 184,000# 20/40 SN; 25,500# 10/20 SN.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/24/1974Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 6
CALC_BBLS_H2O 2
CALC_BBLS_OIL 6
CALC_MCF_GAS 1016
MCF_GAS 1016
Perforation Data:
Interval Top:7770 ft.# Of Holes:40
Interval Bottom:7820 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  AB - 11/11/2013                Interval Top: 7330 ft.    Interval Bottom: 7350 ft.

 Completed Information for Formation CODELL
1st Production Date:2/1/1996Choke Size: 
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/1974
Treatment Summary:DIVERTAFRAC: PUMPED 72 BBLS POLYMER GEL & 212 BBLS OF GEL W/4,500# 20/40 SAND. FLUSHED W/102 BBLS GEL. CODL FRAC: PUMPED 484 BBLS POLYMER GEL & 907 BBLS GEL W/175,000# 20/40 SAND. FLUSHED W/29 BBLS GEL. MAX PSI: 6,600. MAX RATE:15.7 BPM.
Tubing Size:2.375 in.Tubing Setting Depth:7334 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/1996Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 100
CALC_BBLS_H2O 7
CALC_BBLS_OIL 100
CALC_GOR 1140
CALC_MCF_GAS 114
CASING_PRESS 1980
MCF_GAS 114
TUBING_PRESS 961
Perforation Data:
Interval Top:7330 ft.# Of Holes:80
Interval Bottom:7350 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/11/2013                Interval Top: 7330 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation J-CODELL
1st Production Date:4/23/1997Choke Size: 
Formation Name:J-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/25/1974
Treatment Summary:COMMINGLE J SAND & CODELL
Tubing Size:2.375 in.Tubing Setting Depth:7759 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/1997Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 9
CALC_BBLS_H2O 6
CALC_BBLS_OIL 9
CALC_GOR 58444
CALC_MCF_GAS 526
MCF_GAS 526
Perforation Data:
Interval Top:7330 ft.# Of Holes:120
Interval Bottom:7820 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/11/2013
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No