|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/10/2018 Measured TD: 8110 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/10/2018 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 3/24/2011 | | Proposed Depth/Form: | 8110 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 213 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 213 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8110 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 6400 ft., Bottom: 8110 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/17/1973 | | Spud Date: | 9/4/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 8110 ft. | Measured PB depth: | 8039 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CR-CCL-VDL-SL RUN 5/14/10 FOR SQUEEZE | | Log Types: | SP-IES, FDC-GR-CAL CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 213 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8110 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7400 ft., Bottom: 8110 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7445 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6420 ft., Bottom: 7360 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 320 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 10 ft., Bottom: 320 ft., Determination Method: VISU | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 826 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 320 ft., Bottom: 826 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 310 ft., Bottom: 310 ft., Sacks: 120, Method: SQUEEZE | | Additional Cement: | String Type: SURF , Top: 310 ft., Depth: 322 ft., Bottom: 322 ft., Sacks: 15, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7894 ft. | | N | N |
Formation JSND Formation Classification: OG Status: AB - 5/10/2018 Interval Top: 7897 ft. Interval Bottom: 7950 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/30/1973 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/24/2012 | | Treatment Summary: | JS PERF 7897-7950 HOLES 33
4/24/2012 - Cleared out sand plug over JS to commingle well
4/30/2012 - Commingled J-Niobrara-Codell production | | Formation Treatment | | Treatment Date: | 5/13/2010 | | Treatment Summary: | SET CBIP @ 7510' W/1,150# SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE CIBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 27 | | CALC_GOR | 32296 | | MCF_GAS | 872 |
| | Perforation Data: | | Interval Top: | 7897 ft. | # Of Holes: | 33 | | Interval Bottom: | 7950 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OG Status: AB - 5/10/2018 Interval Top: 7445 ft. Interval Bottom: 7460 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/30/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/24/2012 | | Treatment Summary: | CD PERF 7445-7460 HOLES 60
4/24/2012 - Cleared out sand plug over JS to commingle well
4/30/2012 - Commingled J-Niobrara-Codell production |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7445 ft. | # Of Holes: | 60 | | Interval Bottom: | 7460 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/1/2012 Interval Top: 7350 ft. Interval Bottom: 7460 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/7/1995 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2010 | | Treatment Summary: | SET CIBP @ 7510' W/1,150# SAND FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE CIBP TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 20 | | CALC_GOR | 3400 | | CASING_PRESS | 1549 | | MCF_GAS | 68 | | TUBING_PRESS | 985 |
| | Perforation Data: | | Interval Top: | 7350 ft. | # Of Holes: | 64 | | Interval Bottom: | 7460 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OG Status: CM - 5/11/2012 Interval Top: 7204 ft. Interval Bottom: 7950 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/30/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/24/2012 | | Treatment Summary: | NB PERF 7204-7316 HOLES 64 SIZE .42
CD PERF 7445-7460 HOLES 60
JS PERF 7897-7950 HOLES 33
4/24/2012 - Cleared out sand plug over JS to commingle well
4/30/2012 - Commingled J-Niobrara-Codell production |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7851 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/11/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1275 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 14000 | | CALC_MCF_GAS | 14 | | CASING_PRESS | 654 | | GRAVITY_OIL | 51 | | MCF_GAS | 14 | | TUBING_PRESS | 520 |
| | Perforation Data: | | Interval Top: | 7204 ft. | # Of Holes: | 157 | | Interval Bottom: | 7950 ft. | Hole Size: | 0.42 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/12/1998| Completed Information for Formation J-CODELL | | 1st Production Date: | 8/12/1995 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/5/1973 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00078827 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7430 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/12/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 2 | | CALC_GOR | 129000 | | MCF_GAS | 258 |
| | No Perforation Data was found for formation J-CDL. |
|
Formation NBRR Formation Classification: OG Status: CM - 5/30/2012| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/26/2010 | | Treatment Summary: | FRAC NBRR W/500 GAL 15% HC1 & 166,652 GAL ISTAR HYBRID & 250,880# 20/40 SAND & 4460# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1230 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 32 | | CASING_PRESS | 703 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/10/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|