Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07827
Well Classification: GW Status: PA - 9/27/2022
Well Name/No:HOWELL #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:68476
Facility Status:PAStatus Date9/27/2022
FacilityID:240039LocationID:317835
County:WELD #123Location:SWSW 32 4N64W 6
Field:WATTENBERG - #90750Elevation:4800 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  1200 FWLLat/Long: 40.264487 / -104.580074Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.264570 / -104.579970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/27/2022             Measured TD: 7620 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/27/2022
Wellbore Permit
Permit #:730652 Expiration Date:12/13/1992
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:9/2/1973
Spud Date:8/23/1973Spud Date Is:ACTUAL
Measured TD:7620 ft.Measured PB depth:7558 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 353 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 353 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7050 ft., Bottom: 7607 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6316 ft., Bottom: 7015 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 4008 ft., Bottom: 4701 ft., Determination Method: CBL
Casing:String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 240 ft., Bottom: 2055 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4315 ft.
NIOBRARA6704 ft.
CODELL7002 ft.
CARLILE7010 ft.
GREENHORN7065 ft.
BENTONITE7288 ft.
D SAND7398 ft.
J SAND7444 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 12/9/2019                 Interval Top: 7470 ft.    Interval Bottom: 7484 ft.

 Completed Information for Formation J SAND
1st Production Date:9/19/1973Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/21/1973
Treatment Summary:38,000 GAL FLUID, 20/40 SAND & 36,000 # OKLA
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 255
CASING_PRESS 420
MCF_GAS 255
TUBING_PRESS 200
Perforation Data:
Interval Top:7470 ft.# Of Holes:36
Interval Bottom:7484 ft.Hole Size:0.3 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/9/2019                 Interval Top: 7004 ft.    Interval Bottom: 7017 ft.

 Completed Information for Formation CODELL
1st Production Date:12/23/1986Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/10/2019Treatment End Date:N/A
Treatment Summary:6/24/2009: Codell trifrac 7004'-7017', 0.42 diameter, 3,118 bbls slurry, 246,200 lbs 20/40
Total fluid used in treatment (bbls):3118Max pressure during treatment (psi):6026
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):246200Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/21/1973
Treatment Summary:131,586 GAL VISTAR 22/23/24# GEL & 246,200# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 43
CALC_BBLS_H2O 9
CALC_BBLS_OIL 43
CALC_GOR 12860
CALC_MCF_GAS 553
MCF_GAS 553
TUBING_PRESS 560
Perforation Data:
Interval Top:7004 ft.# Of Holes:57
Interval Bottom:7017 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/27/2022                 Interval Top: 6734 ft.    Interval Bottom: 7017 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/23/1986Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/21/1973
Treatment Summary:ACIDIZE W/ 500 GAL 7-1/2/% HCI 108,234 GAL 40/35# GEL FLUID, 2,500# 100 MESH & 282,000#20/40 SAND, 12/05/1986
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 30
CALC_BBLS_OIL 30
CALC_GOR 5
CALC_MCF_GAS 155
CASING_PRESS 520
MCF_GAS 155
TUBING_PRESS 180
Perforation Data:
Interval Top:6734 ft.# Of Holes:70
Interval Bottom:7017 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/9/2019                 Interval Top: 6734 ft.    Interval Bottom: 6923 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/23/1986Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/21/1973
Treatment Summary:LIMITED ENTRY FRAC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6734 ft.# Of Holes:13
Interval Bottom:6923 ft.Hole Size:

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 12/9/2019                 Interval Top: 4412 ft.    Interval Bottom: 4455 ft.

 Completed Information for Formation SUSSEX
1st Production Date:4/19/1994Choke Size: 
Formation Name:SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/21/1973
Treatment Summary:SQUEEZED W/20 SX MAGNA FIBER ON 8/16/02
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 21
CALC_BBLS_H2O 6
CALC_BBLS_OIL 21
CALC_GOR 5
CALC_MCF_GAS 114
CASING_PRESS 500
MCF_GAS 114
TUBING_PRESS 650
Perforation Data:
Interval Top:4412 ft.# Of Holes:12
Interval Bottom:4455 ft.Hole Size:0.3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/27/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No