|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2020 Measured TD: 8070 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2020 | | Wellbore Permit | | | Permit #: | 20042467 | Expiration Date: | 11/4/2005 | | Proposed Depth/Form: | 8070 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-1 , Unit Acreage: 320, Drill Unit: S2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 133 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 125, Top: 0 ft., Bottom: 133 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7946 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7946 ft. | | Casing: | String Type: 1ST LINER, Hole Size: , Size: 1.5 in., Top: , Depth: 7800 ft., Weight: 6.5 , Citings Type: PLANNED | | Cement: | Sacks: 25, Top: , Bottom: 7800 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 7/12/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 8070 ft. | Measured PB depth: | 8906 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | IES - FDC/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 133 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 0 ft., Bottom: 133 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.625 in., Size: 4.5 in., Top: 0 ft., Depth: 7946 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7324 ft., Bottom: 7946 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7200 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6490 ft., Bottom: 7200 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2941 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 2866 ft., Bottom: 2950 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 968 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 542 ft., Bottom: 958 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 1686 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 1550 ft., Bottom: 1700 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4514 ft. | | N | N | | NIOBRARA | 7002 ft. | | N | N | | CARLILE | 7357 ft. | | N | N | | GREENHORN | 7386 ft. | | N | N | | D SAND | 7725 ft. | | N | N | | J SAND | 7765 ft. | | N | N | | DAKOTA | 7969 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 11/1/2020 Interval Top: 7804 ft. Interval Bottom: 7820 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/15/1973 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/22/1973 | | Treatment Summary: | SUPER EMULSION W/54,400 GAL. AND 50,500# WP/40 SD, 36000# OKLA. #1, 2000# GB & SD MIX AT 4950 PSI AT BPM ISIP 2225. |
| | Tubing Size: | 1.5 in. | Tubing Setting Depth: | 7800 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/4/1973 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | CASING_PRESS | 465 | | GRAVITY_OIL | 51 | | MCF_GAS | 300 | | TUBING_PRESS | 205 |
| | Perforation Data: | | Interval Top: | 7804 ft. | # Of Holes: | | | Interval Bottom: | 7820 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 10/31/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|