|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/31/2017 Measured TD: 8100 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/31/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 19730465 | Expiration Date: | 1/8/1998 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 5/21/1974 | | Spud Date: | 8/20/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 8100 ft. | Measured PB depth: | 8014 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES & FDC GR-CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 209 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 209 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8053 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7240 ft., Bottom: 8053 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4610 ft., Bottom: 5000 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4240 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 4030 ft., Bottom: 4250 ft., Determination Method: CBL | | Casing: | String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 4241 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 4030 ft., Bottom: 4245 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 734 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 410 ft., Bottom: 740 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7227 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/31/2017 Interval Top: 7931 ft. Interval Bottom: 7962 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/8/1974 | Choke Size: | 0.281 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/21/1974 | | Treatment Summary: | 341,460 GALS 67,000# 100 MESH SAND 184,800# 20/40 SAND 25,500# 10/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/22/1974 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | MCF_GAS | 660 |
| | Perforation Data: | | Interval Top: | 7931 ft. | # Of Holes: | | | Interval Bottom: | 7962 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 8/31/2017 Interval Top: 7494 ft. Interval Bottom: 7510 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/26/1997 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/21/1974 | | Treatment Summary: | DIVERTAFRAC: PUMPED 71 BBLS OF POLYMER GEL AND 214 BBLS OF GEL WITH 4,500 LBS OF 20/40 SAND. FLUSHED WITH 103 BBLS OF 25 KCL. CODELL FRAC: PUMPED 357 BBLS OF POLYMER GEL AND 1,040 BBLS OF GEL WITH 200,000 LBS OF 20/40 SAND. FLUSHED WITH 30 BBLS OF 2% KCL. MAX PSI: 6,450 MAX RATE: 14.0 BPM |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7491 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/26/1997 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 107 | | BBLS_OIL | 20 | | CALC_GOR | 2150 | | MCF_GAS | 43 |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 64 | | Interval Bottom: | 7510 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/12/1998 Interval Top: 7494 ft. Interval Bottom: 7962 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 5/2/1997 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7926 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/2/1997 | Test Method: | FLOWING | | Hours Tested: | 48 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 35 | | CALC_GOR | 3228.6 | | MCF_GAS | 113 |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 85 | | Interval Bottom: | 7962 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/31/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|