|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/15/2015 Measured TD: 8115 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/15/2015 | Wellbore Permit | | Permit #: | 19730419 | Expiration Date: | 6/25/1974 | Proposed Depth/Form: | 8105 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 4/16/1996 | Spud Date: | 10/15/1973 | Spud Date Is: | ACTUAL | Measured TD: | 8115 ft. | Measured PB depth: | 8066 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SP-IES, FDC-GR CALIPER, BHL-GR SONIC, CBL | Log Types: | SP-IES, FDC-GR-CALAIPER, BHL-GR SONIC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 646 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 646 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8113 ft., Weight: 11.6/10.5, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7293 ft., Bottom: 8113 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3950 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 3900 ft., Bottom: 4000 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4886 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 4200 ft., Bottom: 4886 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4579 ft. | | N | N | NIOBRARA | 7216 ft. | | N | N | CODELL | 7502 ft. | | N | N | MUDDY J | 7938 ft. | | Y | N |
Formation JSND Formation Classification: GW Status: AB - 4/15/2015 Interval Top: 7938 ft. Interval Bottom: 7956 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/4/1973 | Choke Size: | 0.312 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/16/1996 | Treatment Summary: | 311,178 GALS; 130,200# 100 MESH SAND; 352,800# 20/40 SAND; 117,600# 10/20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/11/1974 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 20 | CALC_BBLS_H2O | 10 | CALC_BBLS_OIL | 20 | CALC_GOR | 90000 | CALC_MCF_GAS | 1800 | MCF_GAS | 1800 |
| Perforation Data: | Interval Top: | 7938 ft. | # Of Holes: | 36 | Interval Bottom: | 7956 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 4/15/2015 Interval Top: 7486 ft. Interval Bottom: 7504 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/21/1995 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/16/1996 | Treatment Summary: | DIVERTAFRAC: PUMPED 71 BBLS POLYMER GEL & 214 BBLS GEL W/ 4,500# 20-40 SAND. FLUSHED W/ 103 BBLS GEL. CODL FRAC: PUMPED 381 BBLS GEL & 767 BBLS GEL W/ 210,000# 20-40 SAND. FLUSHED W/ 30 BBLS 2/5 KCL. MAX PSI: 6,590. MAX RATE: 17.5 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/21/1995 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 71 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 71 | CALC_GOR | 99 | CALC_MCF_GAS | 7 | CASING_PRESS | 1191 | MCF_GAS | 7 | TUBING_PRESS | 1588 |
| Perforation Data: | Interval Top: | 7486 ft. | # Of Holes: | 72 | Interval Bottom: | 7504 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/15/2015 Interval Top: 7486 ft. Interval Bottom: 7956 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 4/16/1996 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7508 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/16/1996 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 7 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 7 | CALC_GOR | 30714 | CALC_MCF_GAS | 215 | MCF_GAS | 215 |
| Perforation Data: | Interval Top: | 7486 ft. | # Of Holes: | 108 | Interval Bottom: | 7956 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 04/15/2015 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|