|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2026 Measured TD: 7704 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2026 | | Wellbore Permit | | | Permit #: | 19941072 | Expiration Date: | 2/15/1995 | | Proposed Depth/Form: | 7695 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/6/1994 | | Spud Date: | 6/23/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 7704 ft. | Measured PB depth: | 7687 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP DENSITY, DIL, DBL-CCL-GR | | Log Types: | IES, SFDC-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 513 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 5094 ft., Weight: 15.5,14 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4009 ft. | | N | N | | SUSSEX | 4417 ft. | | N | N | | SHANNON | 4955 ft. | | N | N | | NIOBRARA | 7250 ft. | | N | N | | CODELL | 7520 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 1/1/2026 Interval Top: 7520 ft. Interval Bottom: 7544 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/6/1994 | Choke Size: | 0.312 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/1994 | | Treatment Summary: | 61,488 GALS YF500HT W/ 171,000# 20/40 SAND |
| | Tubing Size: | 2.06 in. | Tubing Setting Depth: | 7451 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/1994 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 32 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 1625 | | CALC_MCF_GAS | 52 | | CASING_PRESS | 1350 | | MCF_GAS | 52 | | TUBING_PRESS | 900 |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 40 | | Interval Bottom: | 7544 ft. | Hole Size: | 0.32 in. |
|
Formation SNSD Formation Classification: OW Status: AB - 11/6/1994 Interval Top: 4958 ft. Interval Bottom: 4978 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | 7/16/1973 | Choke Size: | | | Formation Name: | SHANNON | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/1994 | | Treatment Summary: | 50,500# 10/20, 2000# 8/12 SD, 2/ 46,000 GALS 2% KCL, 15# GEL |
| | Tubing Size: | 2.5 in. | Tubing Setting Depth: | 5084 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SNSD. |
| | Perforation Data: | | Interval Top: | 4958 ft. | # Of Holes: | 21 | | Interval Bottom: | 4978 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: OW Status: AB - 11/6/1994 Interval Top: 4533 ft. Interval Bottom: 4569 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 3/21/1976 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/1994 | | Treatment Summary: | 42,000# 20/40, 220,000# 10/20 SAND; W/ 80,000 GALS SUPER E FLUID |
| | Tubing Size: | 2.5 in. | Tubing Setting Depth: | 4502 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/22/1976 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 190 | | CALC_MCF_GAS | 760 | | CASING_PRESS | 460 | | GRAVITY_OIL | 50 | | MCF_GAS | 760 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 4533 ft. | # Of Holes: | 22 | | Interval Bottom: | 4569 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|