|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/15/2020 Measured TD: 7334 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/15/2020 | | Wellbore Permit | | | Permit #: | 19720992 | Expiration Date: | 11/30/1973 | | Proposed Depth/Form: | 7334 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 316 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-3 , Unit Acreage: 320, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/26/1997 | | Spud Date: | 1/5/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 7334 ft. | Measured PB depth: | 7294 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | I.E.S. & G.R.-DENSITY-CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 481 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 481 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7330 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 6586 ft., Bottom: 7330 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4320 ft. | | N | N | | NIOBRARA | 6450 ft. | | N | N | | D SAND | 7145 ft. | | N | N | | J SAND | 7190 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 7/15/2020 Interval Top: 7183 ft. Interval Bottom: 7232 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/20/1973 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/1997 | | Treatment Summary: | 1,098 BBLS CONDENSATE & 40,250# SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 94.5 | | CASING_PRESS | 375 | | MCF_GAS | 94.5 | | TUBING_PRESS | 75 |
| | Perforation Data: | | Interval Top: | 7183 ft. | # Of Holes: | 39 | | Interval Bottom: | 7232 ft. | Hole Size: | 0.31 in. |
|
Formation CODL Formation Classification: OW Status: AB - 7/15/2020 Interval Top: 6721 ft. Interval Bottom: 6732 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/1/1997 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/26/1997 | | Treatment Summary: | 250,600# 20-40 SAND; 2,171 BBLS FLUID |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 450 | | MCF_GAS | 50 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 6721 ft. | # Of Holes: | 23 | | Interval Bottom: | 6732 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/15/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|