|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/6/2018 Measured TD: 8139 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/6/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19720329 | Expiration Date: | 9/5/1972 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/3/1996 | | Spud Date: | 5/9/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 8139 ft. | Measured PB depth: | 8076 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR - CBL, IES, DENSITY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 296 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 296 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8136 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7200 ft., Bottom: 8136 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4470 ft. | | N | N | | SHANNON | 4920 ft. | | N | N | | NIOBRARA | 7345 ft. | | N | N | | TIMPAS | 7543 ft. | | N | N | | CODELL | 7563 ft. | | N | N | | CARLILE | 7584 ft. | | N | N | | J SAND | 7996 ft. | | N | N | | SKULL CREEK | 8055 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/6/2018 Interval Top: 7997 ft. Interval Bottom: 8026 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/27/1972 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/3/1996 | | Treatment Summary: | ORIGINAL COMPLETION: 1,500 GALS 5.5% BDA; 48,000 GALS 3% HCL DUOFRAC; 43,000# SAND & BEADS. 5/96: 550,000# 20-40 PROPPANT; 187,715 GALS CROSS-LINKED FRAC FLUID. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7989 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 94285 | | CALC_MCF_GAS | 660 | | CASING_PRESS | 950 | | GRAVITY_OIL | 48.8 | | MCF_GAS | 660 | | TUBING_PRESS | 820 |
| | Perforation Data: | | Interval Top: | 7997 ft. | # Of Holes: | 32 | | Interval Bottom: | 8026 ft. | Hole Size: | 0.37 in. |
|
Formation CODL Formation Classification: GW Status: AB - 4/6/2018 Interval Top: 7566 ft. Interval Bottom: 7590 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/23/1990 | Choke Size: | 0.156 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/3/1996 | | Treatment Summary: | 500 GALS 75.% BDA (5 BPM @ 3900#); 182,500# 20-40 MESH; PAD 10.5 BPM @ 4400# |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7982 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/1990 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 44 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 88 | | CALC_GOR | 3409 | | CALC_MCF_GAS | 300 | | MCF_GAS | 150 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7566 ft. | # Of Holes: | 48 | | Interval Bottom: | 7590 ft. | Hole Size: | 0.37 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 6/23/1990 Interval Top: 7566 ft. Interval Bottom: 8026 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 6/23/1990 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation J-CDL. |
| | Perforation Data: | | Interval Top: | 7566 ft. | # Of Holes: | 80 | | Interval Bottom: | 8026 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/06/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|