|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2023 Measured TD: 8050 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2023 | Wellbore Permit | | Permit #: | 19720158 | Expiration Date: | 3/10/1973 | Proposed Depth/Form: | 8000 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 4/10/1972 | Spud Date Is: | ACTUAL | Measured TD: | 8050 ft. | Measured PB depth: | 8011 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | | Log Types: | IES, FDC, CNL,GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: 213 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8047 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 7075 ft., Bottom: 8047 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1054 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1054 ft., Determination Method: CALC | Additional Cement: | String Type: 1ST , Top: 6680 ft., Depth: 7050 ft., Bottom: 7050 ft., Sacks: 200, Method: PERF & PUMP | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 329 ft., Bottom: 329 ft., Sacks: 100, Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4466 ft. | | | | NIOBRARA | 7160 ft. | | | | CODELL | 7464 ft. | | | | J SAND | 7924 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 11/1/2023 Interval Top: 7940 ft. Interval Bottom: 7970 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/18/1993 | Choke Size: | 0.468 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/15/1994 | Treatment Summary: | SEE SCANNED DOCUMENT #00571991 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/26/1993 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 5 | CALC_GOR | 23400 | CASING_PRESS | 340 | GRAVITY_OIL | 117 | TUBING_PRESS | 110 |
| Perforation Data: | Interval Top: | 7940 ft. | # Of Holes: | 60 | Interval Bottom: | 7970 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/14/1997 Interval Top: 7465 ft. Interval Bottom: 7485 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/5/1993 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/15/1994 | Treatment Summary: | SEE SCANNED DOCUMENT #0571991 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/9/1993 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 13 | BBLS_OIL | 25 | CALC_GOR | 2800 | MCF_GAS | 70 | TUBING_PRESS | 340 |
| Perforation Data: | Interval Top: | 7465 ft. | # Of Holes: | 80 | Interval Bottom: | 7485 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/31/2009 Interval Top: 7240 ft. Interval Bottom: 7972 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/15/1994 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. RELEASED RBP @ 7340 AND 7550 TO COMMINGLE THE JSND-NBRR-CDL. 08/25/2009. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7907 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/31/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 3 | BTU_GAS | 1367 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 3 | CALC_GOR | 4967 | CALC_MCF_GAS | 149 | CASING_PRESS | 526 | GRAVITY_OIL | 53 | MCF_GAS | 149 | TUBING_PRESS | 127 |
| Perforation Data: | Interval Top: | 7240 ft. | # Of Holes: | 96 | Interval Bottom: | 7972 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 11/1/2023 Interval Top: 7240 ft. Interval Bottom: 7485 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/31/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/29/2009 | Treatment Summary: | *REFER TO OPERATOR COMMENTS* |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7240 ft. | # Of Holes: | 80 | Interval Bottom: | 7485 ft. | Hole Size: | 0.41 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/14/1997 Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/15/1994 | Treatment Summary: | SEE SCANNED DOCUMENT #00571991 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7362 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/16/1994 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 19 | BBLS_OIL | 10 | CALC_GOR | 15000 | MCF_GAS | 150 |
| No Perforation Data was found for formation J-CDL. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 957 |
Total Gas Produced (MCF) | 13326 |
GOR | 13924 |
GOR Determination | BOE |
Average BOE per Day | 9.734 |
Average MCFE per Day | 56.472 |
Federal Financial Assurance | i | |
|
|