|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 8050 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | | | Permit #: | 19720158 | Expiration Date: | 3/10/1973 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/10/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 8050 ft. | Measured PB depth: | 8011 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | IES, FDC, CNL,GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: 213 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8047 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7075 ft., Bottom: 8047 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1054 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1054 ft., Determination Method: CALC | | Additional Cement: | String Type: 1ST , Top: 6680 ft., Depth: 7050 ft., Bottom: 7050 ft., Sacks: 200, Method: PERF & PUMP | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 329 ft., Bottom: 329 ft., Sacks: 100, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4466 ft. | | | | | NIOBRARA | 7160 ft. | | | | | CODELL | 7464 ft. | | | | | J SAND | 7924 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 7940 ft. Interval Bottom: 7970 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/18/1993 | Choke Size: | 0.468 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/15/1994 | | Treatment Summary: | SEE SCANNED DOCUMENT #00571991 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/26/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 5 | | CALC_GOR | 23400 | | CASING_PRESS | 340 | | GRAVITY_OIL | 117 | | TUBING_PRESS | 110 |
| | Perforation Data: | | Interval Top: | 7940 ft. | # Of Holes: | 60 | | Interval Bottom: | 7970 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/14/1997 Interval Top: 7465 ft. Interval Bottom: 7485 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/5/1993 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/15/1994 | | Treatment Summary: | SEE SCANNED DOCUMENT #0571991 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 25 | | CALC_GOR | 2800 | | MCF_GAS | 70 | | TUBING_PRESS | 340 |
| | Perforation Data: | | Interval Top: | 7465 ft. | # Of Holes: | 80 | | Interval Bottom: | 7485 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/31/2009 Interval Top: 7240 ft. Interval Bottom: 7972 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/15/1994 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. RELEASED RBP @ 7340 AND 7550 TO COMMINGLE THE JSND-NBRR-CDL. 08/25/2009. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7907 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 3 | | BTU_GAS | 1367 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 4967 | | CALC_MCF_GAS | 149 | | CASING_PRESS | 526 | | GRAVITY_OIL | 53 | | MCF_GAS | 149 | | TUBING_PRESS | 127 |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 96 | | Interval Bottom: | 7972 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 7240 ft. Interval Bottom: 7485 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/31/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2009 | | Treatment Summary: | *REFER TO OPERATOR COMMENTS* |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7240 ft. | # Of Holes: | 80 | | Interval Bottom: | 7485 ft. | Hole Size: | 0.41 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/14/1997| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/15/1994 | | Treatment Summary: | SEE SCANNED DOCUMENT #00571991 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7362 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/16/1994 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 10 | | CALC_GOR | 15000 | | MCF_GAS | 150 |
| | No Perforation Data was found for formation J-CDL. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 849 |
| Total Gas Produced (MCF) | 11916 |
| GOR | 14035 |
| GOR Determination | BOE |
| Average BOE per Day | 7.970 |
| Average MCFE per Day | 46.215 |
| Federal Financial Assurance | i | |
|
|