Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07402
Well Classification: OW Status: PR - 2/1/2024
Well Name/No:HENDERSON #41-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:66899
Facility Status:PRStatus Date2/1/2024
FacilityID:239614LocationID:317625
County:WELD #123Location:NENE 4 4N67W 6
Field:JOHNSTOWN - #42600Elevation:4772 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1056FNL  1120 FELLat/Long: 40.346064 / -104.890665Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.345900 / -104.890590Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2024             Measured TD: 7485 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2024
Wellbore Permit
Permit #:710972 Expiration Date:4/7/1972
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:1/13/1972
Spud Date:12/31/1971Spud Date Is:ACTUAL
Measured TD:7485 ft.Measured PB depth:7434 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 206 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 206 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7484 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 7030 ft., Bottom: 7484 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 3220 ft., Depth: 4576 ft., Bottom: 4669 ft., Sacks: 420, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 38 ft., Depth: 841 ft., Bottom: 862 ft., Sacks: 310, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
CODELL0 ft.
SUSSEX4396 ft.
NIOBRARA6668 ft.
FORT HAYS6908 ft.
GREENHORN6990 ft.
BENTONITE7188 ft.
J SAND7364 ft.

Formation JSND                     Formation Classification:  OW                     Status:  TA - 2/1/2014                  Interval Top: 7377 ft.    Interval Bottom: 7407 ft.

 Completed Information for Formation J SAND
1st Production Date:1/26/1972Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7377 ft.# Of Holes:12
Interval Bottom:7407 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/5/2015                 Interval Top: 6935 ft.    Interval Bottom: 6951 ft.

 Completed Information for Formation CODELL
1st Production Date:12/15/1992Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2010
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 5
BTU_GAS 1251
CALC_BBLS_H2O 3
CALC_BBLS_OIL 5
CALC_GOR 4200
CALC_MCF_GAS 21
CASING_PRESS 620
GRAVITY_OIL 52
MCF_GAS 21
TUBING_PRESS 620
Perforation Data:
Interval Top:6935 ft.# Of Holes:93
Interval Bottom:6951 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 2/1/2024                  Interval Top: 6678 ft.    Interval Bottom: 6951 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/20/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2010
Treatment Summary:NIOBRARA PERFS 6678-6824. FRAC'D NIOBRARA W/168,972 GALS OF SLICK WATER, VISTAR, AND 15% HCI WITH 238,000#'S OF OTTAWA SAND COMMINGLE CODELL AND NIOBRARA.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 4
BTU_GAS 1358
CALC_BBLS_H2O 1
CALC_BBLS_OIL 4
CALC_GOR 3500
CALC_MCF_GAS 14
CASING_PRESS 0
GRAVITY_OIL 54
MCF_GAS 14
TUBING_PRESS 80
Perforation Data:
Interval Top:6678 ft.# Of Holes:157
Interval Bottom:6951 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/1/2016                 Interval Top: 6678 ft.    Interval Bottom: 6824 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/20/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6678 ft.# Of Holes:64
Interval Bottom:6824 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)76
GOR
GOR DeterminationMCFE
Average BOE per Day0.036
Average MCFE per Day0.208

 Federal Financial Assurance  i 

 Tribal Well  i No