|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/10/2018 Measured TD: 8010 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/10/2018 | Wellbore Permit | | Permit #: | | Expiration Date: | 2/28/2013 | Proposed Depth/Form: | 8010 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 165 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 150, Top: 0 ft., Bottom: 165 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8009 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 6903 ft., Bottom: 8009 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/24/1971 | Spud Date Is: | ACTUAL | Measured TD: | 8010 ft. | Measured PB depth: | 7980 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | | Log Types: | IES, CNL, GR DENSITY | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 165 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 0 ft., Bottom: 165 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8521 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 6950 ft., Bottom: 8521 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7198 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 70, Top: 6974 ft., Bottom: 7198 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4865 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 4482 ft., Bottom: 4865 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 996 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 218, Top: 144 ft., Bottom: 990 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 6974 ft., Depth: 6987 ft., Bottom: 7198 ft., Sacks: 70, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 4482 ft., Depth: 4865 ft., Bottom: 4865 ft., Sacks: 200, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 500 ft., Depth: 996 ft., Bottom: 990 ft., Sacks: 68, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 144 ft., Depth: 500 ft., Bottom: 500 ft., Sacks: 150, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7205 ft. | | | | J SAND | 7902 ft. | | | | SKULL CREEK | 7945 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/10/2018 Interval Top: 7906 ft. Interval Bottom: 7958 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/12/2014 | Treatment End Date: | N/A | Treatment Summary: | Remove plug over J Sand:
12/7/2013: TOOH with 224 jts 2-3/8 tbg. TIH and tag CIBP @ 7590’. Drill out CIBP and tag bottom @ 7959’. Land tbg @ 7895’. Return well to production.
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 10/10/2011 | Treatment Summary: | CIBP SET AT 7590’ 10/10/2011. THE J-SAND IS TA IN ORDER TO TEST THE NBRR/CD. | Formation Treatment | Treatment Date: | 7/28/1971 | Treatment Summary: | SEE SCANNED DOCUMENT #00056179 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 8 | BBLS_OIL | 5 | CALC_BBLS_H2O | 8 | CALC_BBLS_OIL | 5 | CALC_GOR | 12000 | CALC_MCF_GAS | 60 | CASING_PRESS | 660 | MCF_GAS | 60 | TUBING_PRESS | 310 |
| Perforation Data: | Interval Top: | 7906 ft. | # Of Holes: | 104 | Interval Bottom: | 7958 ft. | Hole Size: | 2.375 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/10/2018 Interval Top: 7298 ft. Interval Bottom: 7466 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/15/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/14/2011 | Treatment Summary: | NIOBRARA PERFS – 7298-7318’, 4 SPF, 80 HOLES. FRAC’D W/139,258 GALS FRAC FLUID AND 250,500# SAND (12/14/2011). CODELL PERFS 7448’-7466’, 7460-7479', 2 SPF, 36 HOLES. FRAC'D W/112,567 GALS FRAC FLUID AND 256,160# SAND (11/19/2011). CIBP SET AT 7590’ 10/10/2011. CFP SET @ 7360’ DRILLED OUT ON 12/19/2011,
|
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7416 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/31/2011 | Test Method: | FLOWING | Hours Tested: | 4 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 22 | BBLS_OIL | 23 | BTU_GAS | 1 | CALC_BBLS_H2O | 117 | CALC_BBLS_OIL | 123 | CALC_MCF_GAS | 379 | CASING_PRESS | 1384 | GRAVITY_OIL | 40 | MCF_GAS | 71 | TUBING_PRESS | 530 |
| Perforation Data: | Interval Top: | 7298 ft. | # Of Holes: | 116 | Interval Bottom: | 7466 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 10/10/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|