|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/19/2025 Measured TD: 7976 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/19/2025 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 6/15/2013 | | Proposed Depth/Form: | 7976 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: J-CDL , Formation: J-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 172 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 172 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7977 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 6990 ft., Bottom: 7977 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 584 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 60, Top: 160 ft., Bottom: 584 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 6/15/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 7976 ft. | Measured PB depth: | 7946 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | I-ES, GR DENSITY | | Log Types: | IES, GR DENSITY; CBL-GR-CCL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 172 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 172 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7977 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6990 ft., Bottom: 7977 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7099 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6420 ft., Bottom: 6990 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 760 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 150 ft., Bottom: 765 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 641 ft. | | | | | SUSSEX | 4417 ft. | | | | | SHANNON | 4713 ft. | | | | | NIOBRARA | 7128 ft. | | | | | FORT HAYS | 7384 ft. | | | | | CODELL | 7404 ft. | | | | | J SAND | 7844 ft. | | | | | SKULL CREEK | 7920 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/19/2025 Interval Top: 7845 ft. Interval Bottom: 7908 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/20/1971 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/11/1997 | | Treatment Summary: | ORIGINAL COMPLETION: 50,000# SAND; 46,000 GALS WATER. 9/96: BP @ 7575 FOR CODL COMPLETION. 7/97: BP REMOVED & JSND & CODL CM'D |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7880 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/1971 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1.5 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 1.5 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 250000 | | CALC_MCF_GAS | 750 | | CASING_PRESS | 2200 | | MCF_GAS | 750 |
| | Perforation Data: | | Interval Top: | 7845 ft. | # Of Holes: | 20 | | Interval Bottom: | 7908 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 5/19/2025 Interval Top: 7406 ft. Interval Bottom: 7422 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/14/1996 | Choke Size: | 0.375 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/11/1997 | | Treatment Summary: | ORIGINAL COMPLETION: FRAC'D 110,500 GALS MEDALLION FRAC 350 LHT/HC/D CONTAINING 10,000# 100 MESH & 392,000# 20-40 SAND. 7/97: CM'D W/ JSND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/13/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 39 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 39 | | CALC_GOR | 2846 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 180 | | MCF_GAS | 111 |
| | Perforation Data: | | Interval Top: | 7406 ft. | # Of Holes: | 32 | | Interval Bottom: | 7422 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 7/11/1997 Interval Top: 7406 ft. Interval Bottom: 7898 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 7/11/1997 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/11/1997 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 10 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 26400 | | CALC_MCF_GAS | 264 | | CASING_PRESS | 300 | | MCF_GAS | 264 | | TUBING_PRESS | 170 |
| | Perforation Data: | | Interval Top: | 7406 ft. | # Of Holes: | 52 | | Interval Bottom: | 7898 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/19/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|