|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/27/2016 Measured TD: 8087 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/27/2016 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 11/22/2013 | Proposed Depth/Form: | 8193 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 699 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 0 ft., Bottom: 699 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8087 ft., Weight: 10.5/11.6, Citings Type: PLANNED | Cement: | Sacks: 200, Top: 7300 ft., Bottom: 8087 ft. | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4320 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 4150 ft., Bottom: 4320 ft. | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4420 ft., Bottom: 4950 ft. |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 5/6/1971 | Spud Date Is: | ACTUAL | Measured TD: | 8087 ft. | Measured PB depth: | 8052 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | | Log Types: | IES, FDC, GR, CNP | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 699 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 699 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8087 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7285 ft., Bottom: 8087 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7195 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 160, Top: 6725 ft., Bottom: 7195 ft., Determination Method: CALC | Additional Cement: | String Type: 1ST , Top: 6725 ft., Depth: 7195 ft., Bottom: 7195 ft., Sacks: 160, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | J SAND | 7950 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/27/2016 Interval Top: 7988 ft. Interval Bottom: 8012 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/28/1971 | Choke Size: | 0.750 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/2/1971 | Treatment Summary: | FRAC'D X 4000# 20/40 SAND 36,000# 10/20 SAND 4000# 12/20 BEADS 1000# 8/12 BEADS |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7914 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/2/1971 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CASING_PRESS | 900 | MCF_GAS | 2300 | TUBING_PRESS | 225 |
| Perforation Data: | Interval Top: | 7988 ft. | # Of Holes: | | Interval Bottom: | 8012 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 10/27/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|