Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07248
Well Classification: GW Status: PA - 6/27/2016
Well Name/No:UPRR 42 PAN AM B #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/27/2016
FacilityID:239461LocationID:317564
County:WELD #123Location:SESW 21 1N67W 6
Field:WATTENBERG - #90750Elevation:5030 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  1650 FWLLat/Long: 40.031978 / -104.899073Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.032036 / -104.899167Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/27/2016             Measured TD: 8300 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/27/2016
Wellbore Permit
Permit #:19980364 Expiration Date:4/12/1999
Proposed Depth/Form:8500 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499,232 , Unit Acreage: 320, Drill Unit: WS
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:3/31/1971
Spud Date:2/17/1971Spud Date Is:ACTUAL
Measured TD:8300 ft.Measured PB depth:8252 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IES, FDC, GR, CNP, CORRELATION, CBL, NFD - IND - GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 204 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 204 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8300 ft., Weight: 10.5/11.6, Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7750 ft., Bottom: 8300 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7690 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 5099 ft., Bottom: 7690 ft., Determination Method:
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4640 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 4610 ft., Bottom: 4640 ft., Determination Method:
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 834 ft., Weight: 10.5/11.6, Citings Type: ACTUAL
Cement:Sacks: 275, Top: 260 ft., Bottom: 845 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS725 ft.NN
SUSSEX4840 ft.NN
NIOBRARA7364 ft.NN
CODELL7722 ft.NN
J SAND8128 ft.NN
MUDDY J8156 ft.NN
DAKOTA8316 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 6/27/2016                 Interval Top: 8316 ft.

 Completed Information for Formation DAKOTA
1st Production Date:7/10/1998Choke Size: 
Formation Name:DAKOTACommingled:Yes
Production Method:FLOWING
Open Hole Completion:Yes
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
No Perforation Data was found for formation DKTA.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/27/2016                 Interval Top: 8157 ft.    Interval Bottom: 8172 ft.

 Completed Information for Formation J SAND
1st Production Date:3/14/1971Choke Size:0.750 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/1971
Treatment Summary:FRAC'D X 4000# 20/40 SN, 36,000# 10/20 SN X 4000# 12/20 BEADS X 1000# 8/12 BEADS
Tubing Size:2.375 in.Tubing Setting Depth:8079 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/1971Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
CASING_PRESS 395
MCF_GAS 2075
TUBING_PRESS 165
Perforation Data:
Interval Top:8157 ft.# Of Holes:
Interval Bottom:8172 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 6/27/2016                 Interval Top: 7722 ft.    Interval Bottom: 7736 ft.

 Completed Information for Formation CODELL
1st Production Date:7/21/1995Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/1971
Treatment Summary:PUMPED 429 BBLS OF POLYMER GEL WITH 597 BBLS OF POLYMER GEL WITH 149,000 LBS OF 20/40 SAND. FLUSHED WITH 32 BBLS OF 2% KCL. PPA: 9.0 MAX PSI: 6580 MAX RATE: 15.7 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 79
CALC_GOR 810
CASING_PRESS 1280
MCF_GAS 64
TUBING_PRESS 800
Perforation Data:
Interval Top:7722 ft.# Of Holes:56
Interval Bottom:7736 ft.Hole Size:0.38 in.

Formation DKJCD                   Formation Classification:  GW                   Status:  CM - 6/27/2016                 Interval Top: 7722 ft.    Interval Bottom: 8172 ft.

 Completed Information for Formation DAKOTA-J-CODELL
1st Production Date:7/10/1998Choke Size: 
Formation Name:DAKOTA-J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:3/31/1971
Treatment Summary:DEEPENED WELL TO DAKOTA AND COMMINGLED WITH J-CODELL
Tubing Size:2.375 in.Tubing Setting Depth:8270 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/9/1998Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 5
CALC_GOR 220600
CASING_PRESS 540
GRAVITY_OIL 60
MCF_GAS 1103
TUBING_PRESS 360
Perforation Data:
Interval Top:7722 ft.# Of Holes:56
Interval Bottom:8172 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 6/27/2016                 Interval Top: 7722 ft.    Interval Bottom: 8172 ft.

 Completed Information for Formation J-CODELL
1st Production Date:9/12/1995Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:8151 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/1995Test Method:FLOWING
Hours Tested:167Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1.4
BBLS_OIL 28
CALC_BBLS_H2O 0.2
CALC_BBLS_OIL 4
CALC_GOR 8000
CALC_MCF_GAS 32
MCF_GAS 224
Perforation Data:
Interval Top:7722 ft.# Of Holes:
Interval Bottom:8172 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/27/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No