|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/7/2019 Measured TD: 7216 ft. Vertical TD: 7216 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/7/2019 | | Wellbore Permit | | | Permit #: | 19700099 | Expiration Date: | 2/13/1993 | | Proposed Depth/Form: | 7200 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | 3/24/1970 | | Spud Date: | 3/12/1970 | Spud Date Is: | ACTUAL | | Measured TD: | 7216 ft. | Measured PB depth: | 7179 ft. | | True Vertical TD: | 7216 ft. | True Vertical PB depth: | 7179 ft. | | Bottom Hole Location: | Sec:8 Twp: 4N 63W | Footage: 660 FNL 660 FEL | | Log Types: | SCH - IES, BHC/GR | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 143 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 94, Top: 0 ft., Bottom: 143 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7215 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6176 ft., Bottom: 7215 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1000 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 550 ft., Bottom: 1030 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4127 ft. | | N | N | | NIOBRARA | 6386 ft. | | N | N | | TIMPAS | 6624 ft. | | | | | CARLILE | 6648 ft. | | | | | CODELL | 6649 ft. | | N | N | | BENTONITE | 6702 ft. | | | | | D SAND | 7038 ft. | | | | | J SAND | 7099 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/7/2019 Interval Top: 7126 ft. Interval Bottom: 7176 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/1/1981 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/1/1981 | | Treatment Summary: | 62,000 GALS WATER FRAC; 59,000# SAND. 40 BPM @ 2800 PSIG; ISIP 950 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7126 ft. | # Of Holes: | | | Interval Bottom: | 7176 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/07/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|