Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-05952
Well Classification: OW Status: PA - 7/19/2022
Well Name/No:PETERS #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:8 NORTH LLC - 10575
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/19/2022
FacilityID:239069LocationID:317524
County:WELD #123Location:NENW 33 12N61W 6
Field:FURY - #27925Elevation:5261 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  1980 FWLLat/Long: 40.971101 / -104.213109Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.971150 / -104.212910Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/19/2022             Measured TD: 7774 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/19/2022
Wellbore PermitDRIFTED
Permit #:19811249 Expiration Date:11/19/1981
Proposed Depth/Form:7580 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: NENW

Wellbore Completed
Completion Date:9/1/1981
Spud Date:8/1/1981Spud Date Is:ACTUAL
Measured TD:7774 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:ELECTRIC LOG, BOND LOG
Casing:String Type: SURF, Hole Size: 12.75 in., Size: 10.75 in., Top: 0 ft., Depth: 194 ft., Weight: 28 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 194 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7774 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: , Bottom: 7774 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6932 ft.
J SAND7700 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/19/2022                 Interval Top: 7700 ft.    Interval Bottom: 7720 ft.

 Completed Information for Formation J SAND
1st Production Date:3/1/2007Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2007
Treatment Summary:DRILLLED OUT CIBP; CLEANED JUNK OUT OF WELL; FRACED WELL WITH 1654 BBLS SLICK AND XL GELLED WATER, 32800# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7578 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2007Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 15
CALC_GOR 0
CASING_PRESS 20
GRAVITY_OIL 37
MCF_GAS 5
TUBING_PRESS 20
Perforation Data:
Interval Top:7700 ft.# Of Holes:120
Interval Bottom:7720 ft.Hole Size:

Formation JNBRR                   Formation Classification:  GW                   Status:  CM - 3/1/2007                  Interval Top: 6932 ft.    Interval Bottom: 7720 ft.

 Completed Information for Formation J-NIOBRARA
1st Production Date:3/1/2007Choke Size: 
Formation Name:J-NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JNBRR.
Perforation Data:
Interval Top:6932 ft.# Of Holes:
Interval Bottom:7720 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  AB - 7/19/2022                 Interval Top: 6932 ft.    Interval Bottom: 6982 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/3/1981Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/1/1984
Treatment Summary:FRACED WITH 56,000 GALLONS OF GELLED DIESEL, 100,000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/1984Test Method:
Hours Tested:24Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 5
MCF_GAS 5
Perforation Data:
Interval Top:6932 ft.# Of Holes:
Interval Bottom:6982 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/19/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No