Formation Treatment |
Treatment Type: | |
Treatment Date: | 11/22/2021 | Treatment End Date: | N/A |
Treatment Summary: | 10/29/2021 MIRU PEAK WIRELINE perforated Marmaton
11/2/2021 Set CIBP @ 7298'
11/3-11/20/21 Waiting on new heater treater. Replaced
11/21/21 Started pumping unit. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/18/2021 | Treatment End Date: | 5/19/2021 |
Treatment Summary: | 4/14/21 Knocked out CIBP
4/15/21 Set RBP @ 7369'
5/18/21 Prostim pumped 2000galsof 15% NEFE Acid w/22bbls Produced water from The Undefeated well
5/19/21 Reset RBP @ 7343' then Prostim pumped 2000gals of 15% NEFE Acid w/22bbls Produced water from the Undefeated well
5/26/21 Released RBP pull out of hole |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/2/2020 | Treatment End Date: | 11/2/2020 |
Treatment Summary: | 11/2/2020 ProStim pumped 12bbls 15% NEFE with mutual solvent and flushed with 40bbls of production oil. Never caught pressure while treating the well. |
Total fluid used in treatment (bbls): | 12 | Max pressure during treatment (psi): | 0 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 |
Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | FRACTURE STIMULATION |
Treatment Date: | 10/22/2019 | Treatment End Date: | 10/22/2019 |
Treatment Summary: | 10/18/19 Set a CIBP @ 7343 w/2sxs cmt on top.
10/22/19 Pumped Frac job 714 bbls of 15% HCl Acid, 12,500# of 100 Mesa White Sand, 51,000# of 40/70 Mesa White Sand and 1974bbls of slick water.
Treating pressure was 3222 PSI. |
Total fluid used in treatment (bbls): | 2688 | Max pressure during treatment (psi): | 3222 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 714 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 1974 | Disposition method For flowback: | |
Total proppant used (lbs): | 63500 | Green completions techniques utilized: | Yes |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/17/2019 | Treatment End Date: | 1/24/2019 |
Treatment Summary: | 1/17/19 Prostim pumped 250gals 7.5% MCA acid with 43bbls 2% KCL flush.
1/18/19 Prostim pumped 1000gals 20% MCA acid with 10gal of RAS 92 and 43bbls 2% KCL water
1/21/19 Prostim pumped 5000gals 20% SGA 2010 acid
1/24/19 Pumped 55bbls 2% KCL wtr down tubing. |
Total fluid used in treatment (bbls): | 290 | Max pressure during treatment (psi): | 4400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 149 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 |
Fresh water used in treatment (bbls): | 141 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | Yes |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/26/2017 | Treatment End Date: | 10/27/2017 |
Treatment Summary: | 10/26/17 Pumped 250 gals 7.5% MCA acid w/additives then pumped 1,000 gals 15% HC1 acid w/additives & 98bbls 2% KCL Biocide. 10/27/17 Pumped 3,000gals 15% HC1 acid, w/additives & 44 bbls 2% KCL Biocide. |
Total fluid used in treatment (bbls): | 243 | Max pressure during treatment (psi): | 700 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 101 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 |
Fresh water used in treatment (bbls): | 142 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | Yes |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/8/2017 | Treatment End Date: | 8/9/2017 |
Treatment Summary: | 8/07/17 Perfed from 7348-7362, 4shots/ft. 8/08/17 Pumped 250gals 7.5 MCA acid, 38bbls KCL Biocide. 8/09/17 Pumped 750gals 15% HC1 acid, 27gals RAS-10; 3gals CIA-165, 3gals IC-75, 1gal SI-4, 42bbls KCL Biocide 2%. |
Total fluid used in treatment (bbls): | 104 | Max pressure during treatment (psi): | 500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 80 | Total flowback volume recovered (bbls): | 70 |
Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | Yes |
Reason green techniques Not utilized: |