Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-121-11048
Well Classification: OW Status: PR - 3/1/2023
Well Name/No:SHOOK #1-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:IMPETRO RESOURCES LLC - 10690
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2023
FacilityID:439391LocationID:439390
County:WASHINGTON #121Location:SENE 29 2S52W 6
Field:WILDCAT - #99999Elevation:4827 ft.
Planned Location:2187FNL  1188 FELLat/Long: 39.851230 / -103.223860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.851230 / -103.223860Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2023             Measured TD: 4730 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2023
Wellbore Permit
Permit #: Expiration Date:10/22/2016
Prop Depth/Form:4700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4700 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 3500 ft., Bottom: 4700 ft.

Wellbore Completed
Completion Date:6/8/2015
Spud Date:6/2/2015Spud Date Is:ACTUAL
Measured TD:4730 ft.Measured PB depth:4680 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CPDCN Micro Log; AI Shallow Focused Elect Log; Microresistivity Log; Comp. Sonic w/Integrated Transit Time; Comp. Neutron Sonic Porosity Overlay; Caliper Log.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 519 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 519 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4718 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 2918 ft., Bottom: 4718 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS3464 ft.NN
NIOBRARA3550 ft.NN
FORT HAYS4029 ft.NN
GREENHORN4117 ft.NN
BENTONITE4346 ft.NN
DAKOTA4438 ft.NN
HUNTSMAN4458 ft.NN
J SAND4486 ft.NY

Formation JSND                     Formation Classification:  OW                     Status:  PR - 3/1/2023                  Interval Top: 4486 ft.    Interval Bottom: 4492 ft.

 Completed Information for Formation J SAND
1st Production Date:10/30/2015Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/23/2020Treatment End Date:N/A
Treatment Summary:1/29/2020 PEAK PERFORATED J-SAND FROM 4488-4492 W/4 SPF
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:3497 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/23/2020Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 300
BBLS_OIL 2
CALC_BBLS_H2O 300
CALC_BBLS_OIL 2
GRAVITY_OIL 22
Perforation Data:
Interval Top:4486 ft.# Of Holes:24
Interval Bottom:4492 ft.Hole Size:0.3 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)1204
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day3.293
Average MCFE per Day19.100

 Federal Financial Assurance  i 

 Tribal Well  i No