|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2025 Measured TD: 5197 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2025 | | Wellbore Permit | | | Permit #: | 19540000 | Expiration Date: | 1/27/1955 | | Proposed Depth/Form: | 5200 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/8/1954 | | Spud Date: | 2/2/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5197 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 93 ft., Weight: 32.75 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 93 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5150 ft., Weight: 14 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 3624 ft., Bottom: 5150 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4373 ft. | | | | | TIMPAS | 4683 ft. | | | | | GREENHORN | 4949 ft. | | | | | D SAND | 5124 ft. | | | |
Formation DSND Formation Classification: OW Status: SI - 5/1/2025 Interval Top: 5143 ft. Interval Bottom: 5149 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 3/12/1954 | Choke Size: | 1.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 480 | | CALC_GOR | 430 | | GRAVITY_OIL | 40 | | MCF_GAS | 206 | | TUBING_PRESS | 70 |
| | Perforation Data: | | Interval Top: | 5143 ft. | # Of Holes: | | | Interval Bottom: | 5149 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 526 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 1.443 |
| Average MCFE per Day | 8.365 |
| Federal Financial Assurance | i | |
|
|