Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-113-06239
Well Classification: GW Status: SI - 3/1/2025
Well Name/No:ANDY'S MESA FED #67
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:AMERICAN HELIUM LLC - 10841
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC099284
Facility Status:SIStatus Date3/1/2025
FacilityID:291204LocationID:334362
County:SAN MIGUEL #113Location:NENE 29 44N16W N
Field:ANDY'S MESA - #2500Elevation:6579 ft.
Basin:PARADOX BASIN  
Planned Location:420FNL  1142 FELLat/Long: 38.050390 / -108.653420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 38.050420 / -108.653440Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2025             Measured TD: 8080 ft.    Vertical TD: 7914 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20091857 Expiration Date:4/29/2010
Proposed Top PZ Location:Sec: Twp: Footage: 854 FNL  2152 FEL
Bottom Hole Location:Sec:29 Twp: 44N 16W Footage: 854 FNL  2152 FEL
Proposed Depth/Form:8287 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:ANDY'S MESA UNI Unit Number:COC47585X
Formation And Spacing:Code: CTLR , Formation: CUTLER , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: HRMS , Formation: HERMOSA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 3954 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1390, Top: 0 ft., Bottom: 3907 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 8080 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1040, Top: 3230 ft., Bottom: 8080 ft.

Wellbore Completed
Completion Date:11/9/2007
Spud Date:9/30/2007Spud Date Is:ACTUAL
Measured TD:8080 ft.Measured PB depth:8011 ft.
True Vertical TD:7914 ft.True Vertical PB depth:7844 ft.
Top PZ Location:Sec: Twp: Footage: 854 FNL  2152 FEL
Bottom Hole Location:Sec:29 Twp: 44N 16WFootage: 879 FNL  2164 FEL
Log Types:PEX-TRIPLE COMBO, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3954 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1390, Top: 0 ft., Bottom: 3907 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8080 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 3230 ft., Bottom: 8080 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
CUTLER4650 ft.NN
HONAKER TRAIL6495 ft.NN

Formation HNKRT                   Formation Classification:  GW                   Status:  SI - 3/1/2025                  Interval Top: 6687 ft.    Interval Bottom: 7997 ft.

 Completed Information for Formation HONAKER TRAIL
1st Production Date:N/AChoke Size: 
Formation Name:HONAKER TRAILCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/11/2015Treatment End Date:N/A
Treatment Summary:Please see Wellbore Diagram for correction to the original 5A submitted missing interval 6687'-6790'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/14/2007
Treatment Summary:STAGES 01-06 TREATED W/TOTAL OF: 1850 BBL OF SLICKWATER, 336140 LBS 20-40 SAND. SEE ATTACHED DOC FOR DETAILS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 0
BTU_GAS 1170
MCF_GAS 7570
Perforation Data:
Interval Top:6687 ft.# Of Holes:703
Interval Bottom:7997 ft.Hole Size:0.34 in.

Formation CTLR                     Formation Classification:  GW                     Status:  CM - 5/11/2015                 Interval Top: 4170 ft.    Interval Bottom: 6108 ft.

 Completed Information for Formation CUTLER
1st Production Date:N/AChoke Size: 
Formation Name:CUTLERCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/11/2015Treatment End Date:N/A
Treatment Summary:Recompletion of the Cutler formation was never submitted by original operator, Encana, and no historical completion summaries were available from Encana for these perforations. To the best of our knowledge, from production logs and sundry notices, a RBP was set @ 6,700' and the Cutler formation was perforated in April 2009. The RBP was then removed during 1/31/12 and 2/712 and the two formations were comingled per approved Form 4. Please note number of holes perforated is not known.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CTLR.
Perforation Data:
Interval Top:4170 ft.# Of Holes:
Interval Bottom:6108 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.011
Average MCFE per Day0.064

 Federal Financial Assurance  i Y

 Tribal Well  i No