|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2021 Measured TD: 9000 ft. Vertical TD: 8820 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20054801 | Expiration Date: | 12/29/2006 | | Proposed Top PZ Location: | Sec:36 Twp: 45N 15W | Footage: 660 FSL 1980 FWL | | Bottom Hole Location: | Sec:36 Twp: 45N 15W | Footage: 660 FSL 1980 FWL | | Proposed Depth/Form: | 9195 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | HAMILTON | Unit Number: | COC 047632X | | Formation And Spacing: | Code: HRMS , Formation: HERMOSA , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 60 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 60 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/2/2006 | | Spud Date: | 1/3/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 9000 ft. | Measured PB depth: | 8940 ft. | | True Vertical TD: | 8820 ft. | True Vertical PB depth: | 8760 ft. | | Top PZ Location: | Sec:36 Twp: 45N 15W | Footage: 591 FSL 2001 FWL | | Bottom Hole Location: | Sec:36 Twp: 45N 15W | Footage: 591 FSL 2001 FWL | | Log Types: | CBL, AIT TRIPLE COMBO INDUCTION LOG, MUDLOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1685 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 1685 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8985 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 2115, Top: 150 ft., Bottom: 8990 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | CUTLER | 1650 ft. | | N | N | | HONAKER TRAIL | 6462 ft. | | N | N | | HERMOSA | 6462 ft. | | N | N | | LASAL | 8060 ft. | | N | N | | ISMAY | 8511 ft. | | N | N |
Formation HRMS Formation Classification: GW Status: SI - 11/1/2021 Interval Top: 7506 ft. Interval Bottom: 8751 ft.| Completed Information for Formation HERMOSA | | 1st Production Date: | 3/16/2006 | Choke Size: | | | Formation Name: | HERMOSA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/2006 | | Treatment Summary: | FRAC W/SLB 330,000 GAL WF 120 70Q FOAM, 39,432 WF 120 W/504,000# 20/40 JORDAN-UNIMIN AND 100,000# 20/40 OPTIPROP. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7426 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/17/2006 | Test Method: | FLOW TEST | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 962 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 2232 | | CASING_PRESS | 475 | | MCF_GAS | 2232 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7506 ft. | # Of Holes: | 328 | | Interval Bottom: | 8751 ft. | Hole Size: | 3.125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 10/31/2021 |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|