|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 8004 ft. Vertical TD: 7866 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20022096 | Expiration Date: | 11/20/2003 | | Proposed Depth/Form: | 8219 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | ANDY'S MESA FIE | Unit Number: | | | Formation And Spacing: | Code: CTARK , Formation: CUTLER-ARKOSE , Order: , Unit Acreage: 40, Drill Unit: SE SE | | Formation And Spacing: | Code: HNKRT , Formation: HONAKER TRAIL , Order: , Unit Acreage: 40, Drill Unit: SE SE | | Formation And Spacing: | Code: ISMY , Formation: ISMAY , Order: , Unit Acreage: 40, Drill Unit: SE SE | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 40 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/28/2003 | | Spud Date: | 4/16/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8004 ft. | Measured PB depth: | 7796 ft. | | True Vertical TD: | 7866 ft. | True Vertical PB depth: | | | Log Types: | CEMENT BOND LOG/GAMMA RAY/C C L | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3337 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 832, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8004 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 4320 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | CUTLER | 5181 ft. | | N | N | | HONAKER TRAIL | 7646 ft. | | N | N |
Formation CTLR Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 5444 ft. Interval Bottom: 7797 ft.| Completed Information for Formation CUTLER | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | CUTLER | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/28/2003 | | Treatment Summary: | NO STIMULATION TREATMENT, SQUEEZED 5854-5986 W/6.6 BBLS CEMENT / PERFS; AT 7632 - 7644, 7614-7620, 7597-7607 AND 7536-7546 WERE PLUGGED BACK W/CIBP @ 7500' (5/30/03 / PERFS; AT 7276-7286, 7266-7270 AND 7242-7248 WERE PLUGGED BACK W/CIBP @ 7205' (5/31/03) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6540 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/29/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | CASING_PRESS | 1300 | | MCF_GAS | 4350 | | TUBING_PRESS | 1140 |
| | Perforation Data: | | Interval Top: | 5444 ft. | # Of Holes: | 1344 | | Interval Bottom: | 7797 ft. | Hole Size: | 3 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 5 |
| Total Gas Produced (MCF) | 1174 |
| GOR | 234800 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.568 |
| Average MCFE per Day | 3.285 |
| Federal Financial Assurance | i | Y |
|
|