|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 8496 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20022001 | Expiration Date: | 11/11/2003 | | Proposed Depth/Form: | 7745 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | ANDY'S MESA | Unit Number: | | | Formation And Spacing: | Code: CTARK , Formation: CUTLER-ARKOSE , Order: , Unit Acreage: 40, Drill Unit: SW SE | | Formation And Spacing: | Code: HNKRT , Formation: HONAKER TRAIL , Order: , Unit Acreage: 40, Drill Unit: SW SE | | Formation And Spacing: | Code: ISMY , Formation: ISMAY , Order: , Unit Acreage: 40, Drill Unit: SW SE | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 40 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/7/2003 | | Spud Date: | 8/12/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8496 ft. | Measured PB depth: | 8437 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,CNL/LDT, PE,AI SP-GR-CALIPER, MICROCYLINDRICALLY FOCUSED LOG,DIPOLE SHER SONIC TOOL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3340 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 3340 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8496 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1271, Top: 4170 ft., Bottom: 8442 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | CUTLER-ARKOSE | 4871 ft. | 7181 ft. | N | N | | HONAKER TRAIL | 7182 ft. | 7984 ft. | N | N | | ISMAY | 7985 ft. | 8484 ft. | N | N | | PARADOX | 8485 ft. | | N | N |
Formation HNKRT Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 7182 ft.| Completed Information for Formation HONAKER TRAIL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | HONAKER TRAIL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation HNKRT. |
| | No Perforation Data was found for formation HNKRT. |
|
Formation CT-HT Formation Classification: GW Status: CM - 11/8/2003 Interval Top: 5031 ft. Interval Bottom: 7865 ft.| Completed Information for Formation CUTLER-HONAKER TRAIL | | 1st Production Date: | N/A | Choke Size: | 0.641 in. | | Formation Name: | CUTLER-HONAKER TRAIL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/7/2003 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 4993 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/8/2003 | Test Method: | FLOW | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 194450 | | CALC_MCF_GAS | 3889 | | CASING_PRESS | 960 | | MCF_GAS | 3889 | | TUBING_PRESS | 950 |
| | Perforation Data: | | Interval Top: | 5031 ft. | # Of Holes: | 1616 | | Interval Bottom: | 7865 ft. | Hole Size: | 3 in. |
|
Formation CTLR Formation Classification: GW Status: SI - 2/1/2025| Completed Information for Formation CUTLER | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CUTLER | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CTLR. |
| | No Perforation Data was found for formation CTLR. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 4 |
| Total Gas Produced (MCF) | 323 |
| GOR | 80750 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.162 |
| Average MCFE per Day | 0.932 |
| Federal Financial Assurance | i | Y |
|
|