|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2024 Measured TD: 8720 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2024 | | Wellbore Permit | | | Permit #: | 20020600 | Expiration Date: | 4/11/2003 | | Proposed Depth/Form: | 8240 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | ANDY'S MESA | Unit Number: | | | Formation And Spacing: | Code: CTARK , Formation: CUTLER-ARKOSE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: HNKRT , Formation: HONAKER TRAIL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ISMY , Formation: ISMAY , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 40 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 40 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/16/2002 | | Spud Date: | 8/6/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8720 ft. | Measured PB depth: | 8666 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DI - CAL - SP - GR - FDC - CNL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 3295 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 664, Top: 0 ft., Bottom: 3295 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8714 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 820, Top: 2650 ft., Bottom: 8714 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | BURRO CANYON | 332 ft. | | N | N | | MORRISON | 448 ft. | | N | N | | ENTRADA | 1181 ft. | | N | N | | CARMEL | 1294 ft. | | N | N | | NAVAJO | 1408 ft. | | N | N | | WINGATE | 2190 ft. | | N | N | | CHINLE | 2436 ft. | | N | N | | SHINARUMP | 2824 ft. | | N | N | | MOENKOPI | 2918 ft. | | N | N | | CUTLER | 3682 ft. | | N | N | | CUTLER-ARKOSE | 5043 ft. | | N | N | | HONAKER TRAIL | 7409 ft. | | N | N | | ISMAY | 7906 ft. | | N | N |
Formation ISMY Formation Classification: GW Status: AB - 9/14/2015 Interval Top: 8038 ft. Interval Bottom: 8400 ft.| Completed Information for Formation ISMAY | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | ISMAY | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2002 | | Treatment Summary: | PERFORATIONS FROM 8038-50', 8360-72', 8390-8400', 3-3/8", 4 SPF, 90 DEG PHASING, 22.7 GRM ( 136 HOLES ). DRY. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 0 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 8038 ft. | # Of Holes: | 136 | | Interval Bottom: | 8400 ft. | Hole Size: | 3 in. |
|
Formation HNKRT Formation Classification: GW Status: AB - 9/14/2015 Interval Top: 7445 ft. Interval Bottom: 7686 ft.| Completed Information for Formation HONAKER TRAIL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | HONAKER TRAIL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2002 | | Treatment Summary: | PERFORATIONS FROM 7445-65', 7676-86'. NO STIMULATION TREATMENT. PLUGGED BACK (DRY) CIBP SET @ 7430' W/2 SX CMT ON TOP. | | Formation Treatment | | Treatment Date: | 9/13/2002 | | Treatment Summary: | A CIBP set @ 7430' with 2 sxs cement. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation HNKRT. |
| | Perforation Data: | | Interval Top: | 7445 ft. | # Of Holes: | 120 | | Interval Bottom: | 7686 ft. | Hole Size: | 3 in. |
|
Formation CTLR Formation Classification: GW Status: SI - 12/1/2024 Interval Top: 5630 ft. Interval Bottom: 7134 ft.| Completed Information for Formation CUTLER | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CUTLER | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/21/2015 | Treatment End Date: | N/A | | Treatment Summary: | 05/21/2015: CIBP set @ 5565' with two sacks of cement abandoning the Cutler perforations.
09/14/2002: CIBP set @ 6990' temporarily abandoning perforations 7012' - 7134'.
A previous operator added the following perforations in 2003:
07/27/2003: Cutler perforations added 6332'-6340',6350'-6380', 6407'-6415' (3-3/8", 4 spf, 90 deg phasing, 22.7 grm, 184 holes)
07/29/2003: Cutler perforations added 5630'-5638' (3-3/8", 4 spf, 90 deg phasing, 22.7 grm, 32 holes) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 9/16/2002 | | Treatment Summary: | PERFED 6782-6828',3-3/8", 4 SPF, 90 DEG PHASING 22.7 GRM. THESE PERFS ARE OPEN. NO STIMULATION TREATMENT PERFORMED. PERFECT 7012-7024', 7030-35', 7120-34', 3-3-8", 4 SPF, 90 DEG PHASING 22.7 GRM. THESE PERFS WERE PLUGGED BACK (DRY). CIBP @ 6990' |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 75000 | | CALC_MCF_GAS | 600 | | MCF_GAS | 600 | | TUBING_PRESS | 725 |
| | Perforation Data: | | Interval Top: | 5630 ft. | # Of Holes: | 524 | | Interval Bottom: | 7134 ft. | Hole Size: | 3 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 10/16/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|