|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2025 Measured TD: 9525 ft. Vertical TD: 8651 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2025 | | Wellbore Permit | | | Permit #: | 010930 | Expiration Date: | 5/10/2002 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1826 FNL 2261 FEL | | Bottom Hole Location: | Sec:19 Twp: 44N 16W | Footage: 1826 FNL 2261 FEL | | Proposed Depth/Form: | 9807 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | DOUBLE EAGLE | Unit Number: | | | Formation And Spacing: | Code: CTLR , Formation: CUTLER , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: HNKRT , Formation: HONAKER TRAIL , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: 1ST LINER, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 9087 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1119, Top: 2700 ft., Bottom: 9087 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 7300 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 8/28/2001 | | Spud Date: | 5/29/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 9525 ft. | Measured PB depth: | 8638 ft. | | True Vertical TD: | 8651 ft. | True Vertical PB depth: | | | Bottom Hole Location: | Sec: Twp: | Footage: 2123 FNL 2603 FEL | | Log Types: | PLATFORM EXPRESS, GR-DLL,HLS LATERLOG, BHC SONIC CBL-GR-CCL | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 268 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 9508 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2050, Top: , Bottom: , Determination Method: | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1020, Top: 7520 ft., Bottom: 9508 ft., Determination Method: | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1030 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 7520 ft., Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 9508 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2050, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | HONAKER TRAIL | 7674 ft. | | N | N |
Formation HNKRT Formation Classification: GW Status: SI - 1/1/2025 Interval Top: 8370 ft. Interval Bottom: 8556 ft.| Completed Information for Formation HONAKER TRAIL | | 1st Production Date: | N/A | Choke Size: | 0.297 in. | | Formation Name: | HONAKER TRAIL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/28/2001 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8315 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/29/2001 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 11 | | BTU_GAS | 3071 | | CALC_BBLS_OIL | 11 | | CALC_MCF_GAS | 3071 | | CASING_PRESS | 1090 | | GRAVITY_OIL | 11 | | MCF_GAS | 3071 |
| | Perforation Data: | | Interval Top: | 8370 ft. | # Of Holes: | 408 | | Interval Bottom: | 8556 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1132 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.532 |
| Average MCFE per Day | 3.088 |
| Federal Financial Assurance | i | Y |
|
|