Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/7/2022 | Treatment End Date: | 11/7/2022 |
Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL with additives, inhibitor, mutual solvent and 35 bbls fresh water. |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 2/25/2022 | Treatment End Date: | N/A |
Treatment Summary: | WELLWORK CONSISTED OF PULLING THE INJECTION TUBING BOTH TOP AND BOTTOM PACKERS. RAN NEW PACKERS, YELLOWBAND TUBING AND ADDED TM-40 SPOOL AND HANGER. PRESSURE TEST AND WELLBORE SCHEMATIC ATTACHED. WELL WILL BE RETURNED TO INJECTION PENDING AN APPROVED MIT. ATTACHED IS THE WELLBORE SCHEMATIC. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/28/2021 | Treatment End Date: | 12/28/2021 |
Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15%HCL with 6% citric acid and inhibitor and 47 bbls fresh water. |
Total fluid used in treatment (bbls): | 142 | Max pressure during treatment (psi): | 2000 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/3/2021 | Treatment End Date: | 3/3/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 6% CITRIC ACID AND 50 BBLS WATER
|
Total fluid used in treatment (bbls): | 145 | Max pressure during treatment (psi): | 2250 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 1/20/2017 | Treatment End Date: | N/A |
Treatment Summary: | CORRECTION TO TUBING AND PACKER DEPTHS REPORTED ON FORM 21 DOCUMENT #401109667 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 9/5/2007 |
Treatment Summary: | 8/28/2007 PLUG BACK OPEN HOLE 7306-6775', PUMP 300 SKS CLASS G, 62 BBLS SLURRY @1.5 BPM @225 PSI. 9/4/2007 PERF 6765-6688' IN THREE RUNS WITH 3 SPF @120 DEGREE PHASING. 9/5/2007 PUMP 4200 GAL HEATED 15% HCL ACROSS PERFS 6688-6765' @3.2 BPM @1163 PSI. |