|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2025 Measured TD: 13254 ft. Vertical TD: 12993 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/13/2025 | | Proposed Top PZ Location: | Sec:12 Twp: 4S 96W | Footage: 1528 FSL 194 FEL | | Bottom Hole Location: | Sec:12 Twp: 4S 96W | Footage: 1478 FSL 280 FEL | | Proposed Depth/Form: | 13895 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Ex Liberty Unit | Unit Number: | COC069926X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 94# , Citings Type: PLANNED | | Cement: | Sacks: 221, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 711, Top: 900 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13727 ft., Weight: 13.5# , Citings Type: PLANNED | | Cement: | Sacks: 1689, Top: 4000 ft., Bottom: 13727 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 900 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 201, Top: 0 ft., Bottom: 900 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/24/2024 | | Spud Date: | 11/8/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 13254 ft. | Measured PB depth: | 13030 ft. | | True Vertical TD: | 12993 ft. | True Vertical PB depth: | 12770 ft. | | Top PZ Location: | Sec:12 Twp: 4S 96W | Footage: 1502 FSL 199 FEL | | Bottom Hole Location: | Sec:12 Twp: 4S 96W | Footage: 1462 FSL 359 FEL | | Log Types: | CBL, Neutron (Triple Combo in 103-12623) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 126 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3005 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 738, Top: 925 ft., Bottom: 3005 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13235 ft., Weight: 13.50 , Citings Type: ACTUAL | | Cement: | Sacks: 1824, Top: 5900 ft., Bottom: 13235 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 925 ft., Bottom: 925 ft., Sacks: 380, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | | | | WASATCH | 3495 ft. | | | | | WASATCH G | 6501 ft. | | | | | FORT UNION | 7079 ft. | | | | | OHIO CREEK | 9090 ft. | | | | | WILLIAMS FORK | 9833 ft. | | | | | CAMEO | 12404 ft. | | | | | ROLLINS | 13116 ft. | | | |
Formation WFOCCM Formation Classification: OW Status: PR - 7/1/2025 Interval Top: 9109 ft. Interval Bottom: 12991 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 7/1/2025 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 3/30/2025 | Treatment End Date: | 4/16/2025 | | Treatment Summary: | 15 Stages Plug Perf, 288,571 bbls recycled water, 0 bbls freshwater, 179 bbls 7.5% HCI acid | | Total fluid used in treatment (bbls): | 288750 | Max pressure during treatment (psi): | 7987 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 179 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 288571 | Total flowback volume recovered (bbls): | 34493 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2025 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1023 | | BTU_GAS | 1050 | | CALC_BBLS_H2O | 1023 | | CALC_MCF_GAS | 2411 | | CASING_PRESS | 3934 | | MCF_GAS | 2411 |
| | Perforation Data: | | Interval Top: | 9109 ft. | # Of Holes: | 423 | | Interval Bottom: | 12991 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1331 |
| Total Gas Produced (MCF) | 542936 |
| GOR | 407915 |
| GOR Determination | MCFE |
| Average BOE per Day | 257.848 |
| Average MCFE per Day | 1495.513 |
| Federal Financial Assurance | i | Y |
|
|