|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2024 Measured TD: 13752 ft. Vertical TD: 13301 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/13/2025 | | Proposed Top PZ Location: | Sec:7 Twp: 4S 95W | Footage: 2314 FSL 1897 FWL | | Bottom Hole Location: | Sec:7 Twp: 4S 95W | Footage: 2269 FSL 1765 FWL | | Proposed Depth/Form: | 13766 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Ex Liberty Unit | Unit Number: | COC69926X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 140 ft., Weight: 94 , Citings Type: PLANNED | | Cement: | Sacks: 258, Top: 0 ft., Bottom: 140 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 711, Top: 900 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 14058 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 1744, Top: 4000 ft., Bottom: 14058 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 900 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 201, Top: 0 ft., Bottom: 900 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/27/2024 | | Spud Date: | 8/17/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 13752 ft. | Measured PB depth: | 13271 ft. | | True Vertical TD: | 13301 ft. | True Vertical PB depth: | 12821 ft. | | Top PZ Location: | Sec:7 Twp: 4S 95W | Footage: 2314 FSL 1897 FWL | | Bottom Hole Location: | Sec:7 Twp: 4S 95W | Footage: 2269 FSL 1765 FWL | | Log Types: | CBL (Triple Combo in 103-12623) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 146 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 146 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3015 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 738, Top: 917 ft., Bottom: 3015 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13731 ft., Weight: 13.50 , Citings Type: ACTUAL | | Cement: | Sacks: 1887, Top: 6620 ft., Bottom: 13731 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 917 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 341, Top: 0 ft., Bottom: 917 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 4232 ft. | | | | WASATCH | 4232 ft. | 6743 ft. | | | | WASATCH G | 6743 ft. | 7358 ft. | | | | FORT UNION | 7358 ft. | 9409 ft. | | | | OHIO CREEK | 9409 ft. | 10133 ft. | | | | WILLIAMS FORK | 10133 ft. | 12661 ft. | | | | CAMEO | 12661 ft. | 13412 ft. | | | | ROLLINS | 13412 ft. | 13752 ft. | | |
Formation WFOCCM Formation Classification: OW Status: PR - 7/1/2025 Interval Top: 9427 ft. Interval Bottom: 13209 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 12/10/2024 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 11/30/2024 | Treatment End Date: | 12/9/2024 | | Treatment Summary: | 15 Stages Plug Perf, 288,571 bbls recycled water, 0 bbls freshwater, 179 bbls 7.5% HCI acid
| | Total fluid used in treatment (bbls): | 288750 | Max pressure during treatment (psi): | 8090 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 179 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 288571 | Total flowback volume recovered (bbls): | 45263 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2024 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 840 | | BTU_GAS | 1024 | | CALC_BBLS_H2O | 840 | | CALC_MCF_GAS | 916 | | CASING_PRESS | 2285 | | MCF_GAS | 916 |
| | Perforation Data: | | Interval Top: | 9427 ft. | # Of Holes: | 423 | | Interval Bottom: | 13209 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2387 |
| Total Gas Produced (MCF) | 1043699 |
| GOR | 437242 |
| GOR Determination | MCFE |
| Average BOE per Day | 500.409 |
| Average MCFE per Day | 2902.351 |
| Federal Financial Assurance | i | Y |
|
|