|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2025 Measured TD: 12448 ft. Vertical TD: 11981 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/6/2025 | | Proposed Top PZ Location: | Sec:12 Twp: 2S 98W | Footage: 1349 FSL 1668 FWL | | Bottom Hole Location: | Sec:12 Twp: 2S 98W | Footage: 1349 FSL 1668 FWL | | Proposed Depth/Form: | 12458 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1365 ft., Weight: 54.5 , Citings Type: PLANNED | | Cement: | Sacks: 446, Top: 0 ft., Bottom: 1365 ft. | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3187 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 159, Top: 2154 ft., Bottom: 3187 ft. | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12458 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 993, Top: 6917 ft., Bottom: 12458 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/15/2024 | | Spud Date: | 8/12/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 12448 ft. | Measured PB depth: | 12403 ft. | | True Vertical TD: | 11981 ft. | True Vertical PB depth: | 11936 ft. | | Top PZ Location: | Sec:12 Twp: 2 98 | Footage: 1425 FSL 1785 FWL | | Bottom Hole Location: | Sec:12 Twp: 2 98 | Footage: 1352 FSL 1617 FWL | | Log Types: | CBL, (RES on 05-103-12596) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 82 ft., Weight: 78.67 , Citings Type: ACTUAL | | Cement: | Sacks: 194, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1375 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 558, Top: 0 ft., Bottom: 1375 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3192 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 307, Top: 1311 ft., Bottom: 3192 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12448 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 2118, Top: 2930 ft., Bottom: 12448 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 891 ft. | | | | | WASATCH | 2736 ft. | | | | | WASATCH G | 4996 ft. | | | | | OHIO CREEK | 6998 ft. | | | | | WILLIAMS FORK | 7941 ft. | | | | | CAMEO | 10508 ft. | | | | | ROLLINS | 10978 ft. | | | | | COZZETTE | 11119 ft. | | | | | CORCORAN | 11418 ft. | | | | | SEGO | 11678 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 10/31/2025 Interval Top: 11678 ft. Interval Bottom: 12361 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 9/2/2025 | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/9/2025 | Treatment End Date: | 7/20/2025 | | Treatment Summary: | Iles Member | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11678 ft. | # Of Holes: | 92 | | Interval Bottom: | 12361 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 10/31/2025 Interval Top: 11418 ft. Interval Bottom: 11677 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 9/2/2025 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/9/2025 | Treatment End Date: | 7/20/2025 | | Treatment Summary: | Iles Member | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11418 ft. | # Of Holes: | 31 | | Interval Bottom: | 11677 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 10/31/2025 Interval Top: 11130 ft. Interval Bottom: 11417 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 9/2/2025 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/9/2025 | Treatment End Date: | 7/20/2025 | | Treatment Summary: | Iles Member | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11130 ft. | # Of Holes: | 45 | | Interval Bottom: | 11417 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: OW Status: CM - 9/2/2025 Interval Top: 8560 ft. Interval Bottom: 12361 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 9/2/2025 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/9/2025 | Treatment End Date: | 7/20/2025 | | Treatment Summary: | 256,288 bbls of Slickwater; 3318 gals ( 79 bbls) of Biocide; | | Total fluid used in treatment (bbls): | 256367 | Max pressure during treatment (psi): | 6926 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.65 | | Recycled water used in treatment (bbls): | 256288 | Total flowback volume recovered (bbls): | 86900 | | Fresh water used in treatment (bbls): | 79 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12165 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/2/2025 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1090 | | CALC_MCF_GAS | 3995 | | CASING_PRESS | 2700 | | MCF_GAS | 3995 | | TUBING_PRESS | 2550 |
| | Perforation Data: | | Interval Top: | 8560 ft. | # Of Holes: | 480 | | Interval Bottom: | 12361 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 10/31/2025 Interval Top: 8560 ft. Interval Bottom: 10919 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/2/2025 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/9/2025 | Treatment End Date: | 7/20/2025 | | Treatment Summary: | Williams Fork: 8560' - 10507' with 255 holes
Cameo: 10508' - 10919' with 57 holes | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 8560 ft. | # Of Holes: | 312 | | Interval Bottom: | 10919 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1596 |
| Total Gas Produced (MCF) | 207129 |
| GOR | 129780 |
| GOR Determination | MCFE |
| Average BOE per Day | 101.250 |
| Average MCFE per Day | 587.247 |
| Federal Financial Assurance | i | |
|
|