Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12579
Well Classification: OW Status: PR - 6/1/2025
Well Name/No:FEDERAL #RG 13-18-297
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC0003453
Facility Status:PRStatus Date6/1/2025
FacilityID:483222LocationID:315513
County:RIO BLANCO #103Location:LOT 12 13 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6667 ft.
Basin:PICEANCE BASIN  
Planned Location:953FSL  1075 FELLat/Long: 39.871800 / -108.337946Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.871801 / -108.337946Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/17/2025
End Date: 2/24/2025
Reported: 3/26/2025
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2025             Measured TD: 11875 ft.    Vertical TD: 11444 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/6/2025
Proposed Top PZ Location:Sec:18 Twp: 2S 97W Footage: 2298 FSL  1012 FWL
Bottom Hole Location:Sec:18 Twp: 2S 97W Footage: 2298 FSL  1012 FWL
Proposed Depth/Form:12285 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1357 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 443, Top: 0 ft., Bottom: 1357 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3117 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 154, Top: 2117 ft., Bottom: 3117 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12285 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 993, Top: 6744 ft., Bottom: 12285 ft.

Wellbore Completed
Completion Date:4/22/2024
Spud Date:3/8/2024Spud Date Is:ACTUAL
Measured TD:11875 ft.Measured PB depth:11837 ft.
True Vertical TD:11444 ft.True Vertical PB depth:11405 ft.
Top PZ Location:Sec:18 Twp: 2 97Footage: 2133 FSL  755 FWL
Bottom Hole Location:Sec:18 Twp: 2 97Footage: 2315 FSL  955 FWL
Log Types:CBL, (RES in API 103-12569)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.625 in., Top: 0 ft., Depth: 1378 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 458, Top: 0 ft., Bottom: 1378 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.375 in., Top: 0 ft., Depth: 3150 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 1586 ft., Bottom: 3150 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11872 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1657, Top: 4500 ft., Bottom: 11875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER885 ft.
WASATCH2629 ft.
OHIO CREEK6877 ft.
CAMEO10400 ft.
ILES10908 ft.
ROLLINS10908 ft.
COZZETTE11052 ft.
CORCORAN11326 ft.
SEGO11570 ft.

Formation WFCRCC                 Formation Classification:  OW                 Status:  PR - 3/2/2025                  Interval Top: 6893 ft.    Interval Bottom: 11786 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-ROLLINS-COZZETTE-CORCORAN
1st Production Date:3/2/2025Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-ROLLINS-COZZETTE-CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/17/2025Treatment End Date:2/24/2025
Treatment Summary:209,638 BBLS OF SLICKWATER AND 2,382 GALS OF BIOCIDE
Total fluid used in treatment (bbls):209638Max pressure during treatment (psi):6752
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):209638Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/2/2025Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1179
CALC_MCF_GAS 5480
CASING_PRESS 2520
MCF_GAS 5480
TUBING_PRESS 2490
Perforation Data:
Interval Top:6893 ft.# Of Holes:480
Interval Bottom:11786 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)3574
Total Gas Produced (MCF)687645
GOR192402
GOR DeterminationMCFE
Average BOE per Day331.898
Average MCFE per Day1924.997

 Federal Financial Assurance  i 

 Tribal Well  i No