Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12576
Well Classification: OW Status: PR - 6/1/2025
Well Name/No:FEDERAL #RG 14-18-297
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC0003453
Facility Status:PRStatus Date6/1/2025
FacilityID:483219LocationID:315513
County:RIO BLANCO #103Location:LOT 12 13 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6667 ft.
Basin:PICEANCE BASIN  
Planned Location:946FSL  1068 FELLat/Long: 39.871781 / -108.337921Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.871783 / -108.337920Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/17/2025
End Date: 1/27/2025
Reported: 2/12/2025
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2025             Measured TD: 11880 ft.    Vertical TD: 11571 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/6/2025
Proposed Top PZ Location:Sec:18 Twp: 2S 97W Footage: 901 FSL  1018 FWL
Bottom Hole Location:Sec:18 Twp: 2S 97W Footage: 901 FSL  1018 FWL
Proposed Depth/Form:12084 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1357 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 443, Top: 0 ft., Bottom: 1357 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3082 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 154, Top: 2082 ft., Bottom: 3082 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12084 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 992, Top: 6549 ft., Bottom: 12084 ft.

Wellbore Completed
Completion Date:6/9/2024
Spud Date:2/29/2024Spud Date Is:ACTUAL
Measured TD:11880 ft.Measured PB depth:11835 ft.
True Vertical TD:11571 ft.True Vertical PB depth:11526 ft.
Top PZ Location:Sec:18 Twp: 2 97Footage: 935 FSL  723 FWL
Bottom Hole Location:Sec:18 Twp: 2 97Footage: 810 FSL  965 FWL
Log Types:CBL, (RES on 103-12569).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1380 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 516, Top: 0 ft., Bottom: 1380 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3126 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 1562 ft., Bottom: 3126 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11870 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1633, Top: 3540 ft., Bottom: 11880 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER887 ft.
WASATCH2596 ft.
OHIO CREEK6685 ft.
CAMEO10194 ft.
ILES10685 ft.
ROLLINS10685 ft.
COZZETTE10831 ft.
CORCORAN11171 ft.
SEGO11410 ft.

Formation WFCRCC                 Formation Classification:  OW                 Status:  PR - 2/27/2025                 Interval Top: 6718 ft.    Interval Bottom: 11803 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-ROLLINS-COZZETTE-CORCORAN
1st Production Date:2/27/2025Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-ROLLINS-COZZETTE-CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/17/2025Treatment End Date:1/27/2025
Treatment Summary:214,928 BBLS OF SLICKWATER AND 2,515 GALS OF BIOCIDE
Total fluid used in treatment (bbls):214928Max pressure during treatment (psi):6873
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):214928Total flowback volume recovered (bbls):67281
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:11316 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/27/2025Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1179
CALC_MCF_GAS 5300
CASING_PRESS 2660
MCF_GAS 5300
TUBING_PRESS 2500
Perforation Data:
Interval Top:6718 ft.# Of Holes:504
Interval Bottom:11803 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)4373
Total Gas Produced (MCF)818459
GOR187161
GOR DeterminationMCFE
Average BOE per Day399.041
Average MCFE per Day2314.434

 Federal Financial Assurance  i 

 Tribal Well  i No